A device and construction method for foundation suspension pre-embedded bolts
A technology of pre-embedded bolts and construction methods, which is applied in the direction of infrastructure engineering, construction, etc., can solve the problems of construction alignment and adjustment difficulties, more auxiliary loss materials, more loss materials, etc., and achieve convenient inspection and adjustment, high construction accuracy, Create handy effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0047] The device of the foundation suspension embedded bolt of the present embodiment, as figure 1 As shown, it includes hanging beam 1, bolt rod 5, nut, primary hoarding board 8 and positioning correction board 4, wherein: as figure 2 and 3 As shown, the first-level hoarding 8 is a square pool-like structure surrounded by flat plates, with a specification of 60mm*60mm. There are two hanging beams 1, which are long wooden boards with a thickness of 35mm, a width of 120mm, and a length of 1200mm. Parallel and symmetrical state is placed in the middle of the upper surface of the primary coaming board 8. The positioning correction plate 4 is a square plate-shaped structure with a specification of 50mm*40mm. The positioning of the connecting bolt rod 5 is provided on the hanging beam 1 and the positioning correction plate 4. Hole 7, diameter is 5mm; Nut comprises upper nut 2 and lower nut 3; The upper end of bolt rod 5 is provided with screw thread, and diameter is 3mm, passes ...
Embodiment 2
[0058] The basic structure of the device for suspending pre-embedded bolts in this embodiment is the same as in Embodiment 1, and the improvement is that there are 6 bolt rods 5, and the corresponding positioning holes 7 of the suspension beam 1 and the positioning correction plate 4 are also 6 , cooperating with the arrangement, the six bolt rods 5 work together, and the construction accuracy is higher; the bottom of the bolt rod 5 is fixedly connected with the bracket 6, and the bottom plate 61 of the bracket 6 is fixedly connected with the bottom end of the bolt rod 5, so as to improve the bolt rod 5 in the concrete The stability of the bolt rod 5 and the bottom plate 61 is also fixedly connected with tapered and evenly distributed reinforcing ribs 62 to improve the stability of the connection between the bracket 6 and the bolt rod 5; the bottom end of the primary coaming plate 8 is connected with an area larger The secondary enclosure 9 of the primary enclosure 8, the prima...
Embodiment 3
[0061] The basic steps of the construction method of a foundation suspension pre-embedded bolt device in this embodiment are the same as in Embodiment 2, the difference is that in step B, at the four corners of the coaming boards at all levels, the sides of the two coaming boards A reinforcing plate is fixed between the plates to improve the stability of the connection of the side plates of the hoarding.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com