Asset whole life cycle management system and method

An asset management system, a technology of the whole life cycle, applied in the direction of resources, data processing applications, instruments, etc., can solve the problems of difficult to achieve consistency of accounts and cards, too many equipment, lack of information communication between departments, etc., to improve practicability and efficiency. Convenience, work efficiency and intelligent effects

Inactive Publication Date: 2015-11-25
CHINA SOUTHERN POWER GRID COMPANY +1
View PDF5 Cites 12 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The technical problem to be solved by the present invention is that it is difficult to achieve consistent accounts, cards and objects in the existing power companies due to the numerous e...

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Asset whole life cycle management system and method
  • Asset whole life cycle management system and method
  • Asset whole life cycle management system and method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0025] In order to have a clearer understanding of the technical features, purposes and effects of the present invention, the specific implementation manners of the present invention will now be described in detail with reference to the accompanying drawings.

[0026] In the engineering construction of electric power enterprises, it generally includes three stages, namely the equipment procurement and engineering construction stage, the operation and maintenance stage, and the decommissioning and scrapping stage. Explain in detail.

[0027] refer to figure 1 , which is a schematic diagram of a preferred embodiment of the asset life cycle management system of the present invention. The asset lifecycle management system in this embodiment includes a first encoding unit 1 , an asset management system 2 , a data transfer unit 3 , and a financial management system 4 . The first coding unit 1 is used to generate a unique ID code for each device to be purchased according to the pur...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses an asset whole life cycle management system and a method. The system comprises an identity card code unit, an asset management system, a data transmission unit, and a finance management system, wherein the data transmission unit transmits a book account in the asset management system to the finance management system; and the identity card codes comprise a function position code generated according to to-be-mounted mounting information of each device, and the function position code comprises a space position code or a mounting site code, a process side or a region code. The method and the system of the invention have the beneficial effects that interworking of different departments about device asset data can be realized, consistency among the account, the card and the object can be realized, the working efficiency and intelligence for device asset management are realized, and practicability and convenience of the system are enhanced.

Description

technical field [0001] The invention relates to the field of informatization in the electric power industry, and more specifically, relates to a management system and method for monitoring information throughout the entire process from equipment planning and procurement to decommissioning and scrapping, and realizing the consistency of ledgers, asset cards, and physical objects. Background technique [0002] Power supply enterprises are typical capital-intensive enterprises among enterprises, due to the huge amount, complex types and wide distribution of fixed assets. Equipment management includes a series of information management directly related to equipment, such as daily ledger management, operation inspection, maintenance and elimination, and even decommissioning and scrapping. Since these daily equipment management tasks are scattered in different departments and departments, basically formed the The segmented equipment management model centered on one's own work lack...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/06G06Q50/06
Inventor 张诗军赵继光吴昊姜唯戴志伟龙志尚超赵永国
Owner CHINA SOUTHERN POWER GRID COMPANY
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products