Building grouting pile foundation construction method

A construction method and technology of cast-in-place piles, which are applied in construction, foundation structure engineering, sheet pile walls, etc., can solve problems such as excessive thickness of dregs at the bottom of holes, inconvenient movement of drilling rigs, stuck drills, etc., to avoid the impact of mud on the site, Ensure the continuous construction of pile foundation and improve the effect of construction efficiency

Inactive Publication Date: 2015-09-09
JIANGSU RES INST OF BUILDING SCI
View PDF5 Cites 12 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, as the excavation of the pile foundation becomes deeper and larger, the design and construction of the pile foundation enclosure structure become more and more complicated, and the theory and technology required are getting higher and higher, which far exceeds the standard of construction. In the category of auxiliary measures, the construction unit does not have enough technical force to solve the complex problems of pile foundation stability, deformation and environmental protection, and the intervention of research and design units solves the theoretical calculation and design problems of pile foundation engineering
[0003] At present, a single construction method is generally used for pile foundation drilling, but its construction efficiency is low. Generally, 5-8m can be completed per day in general strata. Complete 20-50cm; but in terms of pile foundation quality, because the bottom is cleaned by dredging and clearing holes, the thickness of the bottom of the hole is easy to control, which can ensure that the quality and thickness of the end-bearing piles meet the requirements
However, its applicable strata are limited, and it is easy to cause accidents such as hole collapse, drill sticking, and buried drill. In terms of pile foundation quality, double-opening drills are used to clean the bottom. If the construction process is not strictly controlled, especially when the mud retaining wall is formed. During construction, it is easy to cause problems such as the thickness of the bottom of the hole exceeding the standard
In addition, if the ground surface is a flat field and the soil layer is newly backfilled, coupled with the influence of rainwater, the site mud will be thicker under the action of muddy water, etc., and the soil layer will be disturbed when the drilling rig moves, and it will be stirred into mud, which is very inconvenient for the drilling rig to move. Even unable to move, had to stop work or take measures such as laying steel plates, which not only increased the construction cost, but also prevented smooth construction

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0028] A method for construction of cast-in-place pile foundations, comprising the steps of:

[0029] Step 1. Construction stakeout: use the total station for coordinate stakeout, stake out points with stakes and nails, and set up guard piles to protect them until they are not needed;

[0030] Step 2. Site treatment: remove sundries, replace the soft soil, ram and compact it. In order to avoid uneven subsidence of the foundation, the drilling rig is tilted, and sleepers are placed on the base of the drilling rig;

[0031] Step 3. Pre-embed the casing: Excavate the soil within 0.5-1m around the casing, tamp and fill the clay to 0.5m below the bottom of the casing, fill the surroundings of the casing with clay or gravel, and the mud on the top of the casing The overflow outlet is about 1.5m higher than the groundwater level, the casing is buried at least 1m to 1.5m deep, and is about 0.3m higher than the ground;

[0032] Step 4. Drilling: Positive circulation drilling is used t...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a building grouting pile foundation construction method. The method comprises the steps of construction layout, site treatment, pile casing pre-burying, hole drilling, hole cleaning, secondary hole cleaning, steel reinforcement cage manufacturing, storage, transportation and laying, trinary hole cleaning, commercial concrete supplying and underwater concrete grouting. The building grouting pile foundation construction method overcomes the defects in the existing pile foundation construction technology, is free of restriction of geological conditions, guarantees the quality of pile foundations, can avoid site concrete condensation influences during pile foundation construction, guarantees continuous construction of pile foundation, lowers construction cost, and improves construction efficiency.

Description

technical field [0001] The invention relates to a construction method for a construction cast-in-place pile foundation, which belongs to the technical field of building foundation and foundation engineering. Background technique [0002] The most basic function of pile foundation engineering is to create conditions for the open excavation of underground engineering. Pile foundations existed as underground engineering construction measures in the early days, just as formwork must be erected to construct reinforced concrete. However, as the excavation of the pile foundation becomes deeper and larger, the design and construction of the pile foundation enclosure structure become more and more complicated, and the theory and technology required are getting higher and higher, which far exceeds the standard of construction. In the category of auxiliary measures, the construction unit does not have enough technical force to solve the complex problems of pile foundation stability, d...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E02D5/38E02D5/66E02D27/12
Inventor 宣云干
Owner JIANGSU RES INST OF BUILDING SCI
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products