[0029] This embodiment is applied to the floor project, which is designed as a pile foundation, with diameters of 1.0m, 1.2m, 1.4m, and 1.6m, and a maximum pile depth of 30m; the geological conditions from top to bottom are: 3-6m artificial miscellaneous filling Soil layer, 5-6m clay layer, 6-8m pebble layer, 3-5m silt layer, below is mudstone, sandy mudstone layer; pile foundation depth design requires 3m into the bedrock.
[0030] The building pile foundation construction method of the present embodiment may further comprise the steps:
[0031] P1: Preparation before drilling: level and tamp the site before construction to meet the bearing capacity requirements of the drilling site; measure and place the pile hole position, set up mud pools and mud circulation grooves; according to the plane position of the building pile foundation and the drilling sequence Lay the drilling platform for supporting the drilling rig on the construction site; use the working platform to provide...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com