Novel prestress industrial stockyard canopy structure and method for constructing same
A prestressed and prestressed steel truss technology, which is applied in the field of new prestressed industrial yard canopy structure and construction, can solve the problems of large thrust of the arched truss support, poor overall stability, and inability to effectively resist wind suction loads, etc. The effect of reducing the cost and reducing the waste of resources
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0042] Such as Figure 1 to Figure 8 As shown, Example 1 is a combined structural system in which space tension beams and arc-shaped prestressed steel trusses are used for super-large-span buildings, and is composed of arc-shaped prestressed steel trusses 1, space tension beams 2, and stable trusses 3; prestressed steel trusses The truss quadrilateral of 1 has a spacing of 36m, a total of 12 trusses, arranged in parallel, with a span of 180m, a height of 8m, and a width of 6m; three longitudinal stabilizing trusses 3 are arranged on the top and both sides of the truss, and space string beams are arranged at positions where no stabilizing trusses are installed.
[0043] The prestressed steel truss 1 is composed of a truss upper chord 11 , a truss lower chord 12 , a truss web 17 , a strut 13 , a lower chord cable 14 , stay cables 15 , and a diagonal brace 16 . Among them, the upper chord 11 of the truss, the lower chord 12 of the truss, and the web 17 of the truss form a quadril...
Embodiment 2
[0048] Such as Figure 9 to Figure 10 As shown, Example 2 is a combined structural system in which a super-long-span building uses space tension beams and square prestressed steel trusses. It is composed of square prestressed steel trusses 1, space tension beams 2, and stable trusses 3; The truss quadrilateral has a spacing of 36m, a total of 12 trusses, arranged in parallel, with a span of 180m, a height of 8m, and a width of 6m; three longitudinal stable trusses 3 are arranged on the top and both sides of the truss, and space string beams are arranged at positions without stable trusses.
[0049] The construction method of the combined structure of prestressed steel truss and space tension beam of the present invention comprises the following steps:
[0050] First, complete the structural design.
[0051] Secondly, determine the construction plan, carry out the simulation analysis of the whole construction process according to the construction plan, and determine the prestr...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com