A monitoring system and construction intelligence technology, applied in the field of information management, can solve problems such as unfavorable decision-making, slow overall process, high error rate, etc., and achieve the effects of command and dispatch, cost saving, and low error rate

Inactive Publication Date: 2015-07-08
BEIJING NINGHUI XINGYE SCI & TECH CO LTD
View PDF6 Cites 34 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] At present, in the construction of the project, the design drawings need to be completed first, and then the design drawings are submitted to the cost engineer to count the quantity and price of each project material. After the cost is completed, it can be sent to Party A for decision-making. After the unit makes a decision, the design will be changed, and the cost and decision-making will need to be re-made. The overall process is slow, which is not conducive to the decision-making of Party A’s unit
[0005] At present, the project leaders in the Party A unit, construction unit and design unit need to listen to reports, or read various reports and drawings to understand the project progress. This method is inefficient, incomplete, and has a high error rate.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Intelligent monitoring system for building design construction based on BIM

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0026] Such as figure 1 As shown, a BIM-based building design and construction intelligent supervision system described in the embodiment of the present invention includes the following structure:

[0027] BIM design workstation 1, said BIM design workstation 1 establishes or modifies architectural design and construction through digital information simulation of the real information of the building, and the design unit uses BIM (Building Information Modeling, Chinese: Building Information Model) to establish a building information model, The project cost engineer prepares the direct cost unit price, partial cost unit price and full cost unit price through the visual information of the building design and construction and the sub-item bill of quantities.

[0028] The bill of quantities includes project serial number, name, unit of measurement, project quantity, unit price of materials, total price of materials and other information showing engineering quantities. Unit price w...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to an intelligent monitoring system for building design construction based on a BIM. The intelligent monitoring system comprises a BIM design work station, a cloud server, a BIM construction work station and a BIM display terminal; analogue simulation is carried out on real information contained by a building by digital information, a building information model is established or modified, and a engineering quantity list is generated through the building information model; the engineering quantity list and the building information model are received by the cloud server through the Internet and stored in a cloud database; data interaction is carried out on the BIM construction work station and the cloud server through the Internet, the engineering quantity list is received, and an engineering construction progress chart is generated; the BIM display terminal is used for receiving information, the display building information model, the engineering quantity list and the engineering construction progress chart of the cloud server through the Internet. An everyday work working plane can be directly realized and divided according to the display building information model, according to the work working plane, needed engineering material quantity and workers can be counted, the waste of materials is reduced, the progress of engineering and the progress of capital use amount can be facilitated to be known by a construction responsible person, and the command and dispatch conducted by the responsible person can be facilitated.

Description

technical field [0001] The invention relates to information management technology, in particular to a BIM-based intelligent supervision system for architectural design and construction. Background technique [0002] Building Information Modeling (Building Information Modeling) is a new technology developing internationally, representing the development direction of the construction industry, and a revolutionary engineering technology. At present, my country's construction industry has begun to gradually understand, accept, and apply this technology. With the development of BIM technology in China, it will have a profound impact on the design and construction of construction projects. The engineering model drawn by BIM technology can include information of all aspects of the model, so BIM technology provides the possibility to solve the efficient collection and sharing of data information in the whole construction process. [0003] At present, in the construction engineering...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/06G06Q50/08
Inventor 蔡雪晖蔡雪宁
Owner BEIJING NINGHUI XINGYE SCI & TECH CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products