Flood submergence duration simulation system and method based on remote sensing
A simulation system and simulation method technology, applied in climate change adaptation, data processing application, prediction, etc., can solve problems such as large amounts of data
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0045] Such as Figure 1 As shown, it is a flow chart of a flood submersion duration simulation method in a preferred embodiment of the present invention. The diachronic simulation method includes the following steps:
[0046] The information reading module reads the remote sensing information;
[0047] The information extraction module extracts the flood submerged range from the remote sensing information to obtain multi-temporal high-time resolution flood submerged range data;
[0048] The submerged range calculation module calculates the flood profile to obtain the evolution result of the flood submerged range;
[0049] The submerged duration calculation module calculates the duration information of flood submersion;
[0050] The output module outputs thematic maps.
[0051] Wherein, the parameter information of the multi-temporal high-time resolution flood submersion range data includes: a time parameter and a water level parameter. The calculation modes of the submer...
Embodiment 2
[0054] Such as figure 2 As shown, it is a diagram of the execution steps of the flood submersion duration simulation system according to a preferred embodiment of the present invention. First, the user needs to determine the number of time phases for inputting the high time resolution flood submersion range data, and input the data time phase by time parameters, water level parameters, and simulation modes; secondly, query the flood inundation range database to confirm whether the calculated flood inundation duration information in the required time period exists in the database. If it exists, it will be directly called out to display and output after superimposing the geospatial projection information; if not, the model will calculate the flood submersion duration information in this time period according to the specified simulation mode, and store it in the database, and superimpose the geospatial projection information output( Figure 7 ); at the same time, the user can c...
Embodiment 3
[0080] In this embodiment, discussion is made in conjunction with the actual use process of the system.
[0081] The input module mainly realizes the input and display of multi-temporal flood submersion range data and its time parameters, water level parameters and other attribute information. First, it is necessary to determine the total time phase of the flood submersion range data (such as image 3 shown); secondly, input the time parameters (year, month, day, hour) and water level parameters (required to keep two decimal places) information of the flood submersion range data in each time phase, the former determines the start and end time of flood submersion duration information extraction, and the latter The former determines the flood rise and fall mode in the flood inundation duration information extraction model (such as Figure 4-7 Shown are four groups of flood submersion range data in different time periods). After the initial information is input, the correspondi...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com