A method for real-time monitoring of floor damage depth in mining face
A technology of damage depth, real-time monitoring, applied in surveying, earthwork drilling, electrical/magnetic detection for logging records, etc. The effect of accurate measurement data, simple monitoring process and short working cycle
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0019] The present invention will be further described below by way of embodiments and in conjunction with the accompanying drawings.
[0020] Example:
[0021] In this embodiment, the specific process of realizing the real-time monitoring of the damage depth of the bottom plate of the working face is as follows:
[0022] (1) The downhole observation system is used for data collection. The downhole observation system is as follows: figure 1 As shown, first connect the measuring cable to the electrodes, the distance between adjacent electrodes is 10m (the distance between the electrodes can be set according to the requirements), and bury the connected measuring cables and electrodes 0.5m below the bottom plate of the working face at one time to prevent mining The fall of the rock mass in the empty area will damage the cable and surround the working face for a week, then connect the resistivity measurement and control host with the multi-pole control converter through the front...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com