Beam-column joint of a layered fabricated steel structure
A technology of beam-column joints and steel structures, which is applied in the direction of building construction and construction, can solve the problems of affecting construction speed and quality, affecting the mechanical performance of joints, and poor ductility of joints, so as to improve the efficiency of on-site assembly and facilitate on-site assembly , the effect of reducing workload
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0021] see Figure 1-3 , when the main beam 3, the upper column 1 and the lower column 2 are preferably I-shaped steel, one end of the main beam 3 is welded with a central column 5, and the central column 5 is also an I-shaped steel, and its upper and lower ends are respectively welded with a central column 5. The upper flange 51 of the column and the lower flange 52 of the middle column, the bottom of the upper column 1 is welded with the upper column flange 11 which is in contact with the upper flange 51 of the middle column, and the top of the lower column 2 is welded with a The lower flange 52 is connected to the lower column flange 21 .
[0022] An upper column stiffener 12 is welded between the upper column flange 11 and the upper column 1 .
[0023] A lower column stiffener 22 is welded between the lower column flange 21 and the lower column 2 .
[0024] The center column upper stiffener 33 is welded between the center column upper flange 51 and the center column 5 . ...
Embodiment 2
[0027] see Figure 4-5 When the main beam 3, the upper column 1 and the lower column 2 are preferably rectangular pipes, the central column 5 is a hollow rectangular tubular structure, and an upper end of the lower column 2 extends upwards to be plugged with the central column 5. Connecting the post 4, the connecting post 4 extends through the center column 5 to the upper column 1 through the gap, and the edges of the upper and lower ends of the center column 5 extend vertically outward respectively to the upper flange 51 of the center column and the lower method of the center column Flange 52, the bottom of the upper column 1 is welded with the upper column flange 11 docking with the upper flange 51 of the middle column, and the top of the lower column 2 is welded with the lower column flange 11 docked with the lower flange 52 of the middle column Lan 21.
[0028] An upper column stiffener 12 is welded between the upper column flange 11 and the upper column 1 .
[0029] A l...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com