[0011] Below, the present invention will be further described in conjunction with specific embodiments:
[0012] A kind of prestressed beam tension end construction method is characterized in that, it comprises:
[0013] Step 1: Set up a sinking concrete pit on both sides or one side of the joint between the prestressed beam and the ordinary concrete beam, and reserve reinforcements that meet the specification requirements for overlapping lengths around the pit according to the specifications and spacing required by the design;
[0014] Step 2, pre-embed the prestressed anchor on the side wall of the pit, so that it can be poured together with the concrete structure;
[0015] Step 3: After the concrete strength reaches the design strength, carry out construction according to the technical requirements of prestressed tension construction;
[0016] Step 4, the tensioning is over, and the hole grouting is completed;
[0017] Step 5: Bind and install the reinforcement rese...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com