System and method for processing communication network faults of State Grid Corporation of China
A technology of communication network and processing system, which is applied in the field of fault handling system of national grid communication network, can solve problems such as low work efficiency, heavy workload, and high consumption, so as to reduce personnel consumption and operating costs, improve employee labor efficiency and enterprise benefit effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment approach 1
[0034] Specific implementation mode one: the following combination figure 1 Describe this embodiment, the national grid communication network fault processing system described in this embodiment, it includes power communication resource database 1, information dispatching unit 2, fault judgment unit 3, fault information output unit 4, fault information collection unit 5, N A communication room 6 and N system terminals 7, wherein N is a positive integer;
[0035] The N fault signal output ends of the N communication equipment rooms 6 are respectively connected to the N fault signal input ends of the fault information collection unit 5;
[0036] The terminal number and the fault type signal output end of the fault information collection unit 5 are connected to the terminal number and the fault type signal input end of the information scheduling unit 2;
[0037] The fault information dispatch signal output end of the information dispatch unit 2 is connected to the fault informat...
specific Embodiment approach 2
[0040] Combine below figure 1 Describe this embodiment. This embodiment is a further supplementary description of Embodiment 1. The functions of the power communication resource database 1 described in this embodiment include the entry of electric power communication resources, data extraction, data query, and fault information entry and query;
[0041] The entry of the power communication resources also includes: entry of fault information after collection and entry of feedback change information after maintenance, entry of data after the circuit is opened and completed, and entry of data changes caused by user migration;
[0042] When querying the fault information of the day, you can query the database, query according to the fault time, enter the date of the day, and all the faults declared on the day will be displayed.
specific Embodiment approach 3
[0043] Specific implementation mode three, combined below figure 1Describe this embodiment, this embodiment is a further supplementary explanation to Embodiment 1, it also includes database copy, and described database copy is used for the local use when there is no network, Synchronized with the master, the data feedback information is entered into the master to update the database information.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com