Protocol conversion method for control center to send data to emergency response center
A technology for sending data and controlling the center, which is applied in the computer field and can solve problems such as the difficulty of unified management and maintenance of signal equipment by subway operating companies
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0017] The present invention provides a protocol conversion method from the ATS server end of the automatic train monitoring system to the emergency response center COCC. The method can be used in rail transit to send data from the line control center to the rail transit emergency response center. For the network architecture diagram, see figure 1 .
[0018] Whole processing flow of the present invention can be divided into three stages:
[0019] The first stage is to subscribe to the equipment attribute information to the ATS server of the automatic train monitoring system. It contains 14 types of objects that can be sent by the ATS terminal of the automatic train monitoring system, the specific content is as follows:
[0020]
[0021]
[0022] After the above subscription information is sent successfully, the automatic train monitoring system ATS will return the status information of the corresponding equipment, and describe it in XML language.
[0023] The second st...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com