Low-temperature fracturing fluid
A fracturing fluid and low-temperature technology, which is applied in the direction of drilling compositions, chemical instruments and methods, etc., can solve problems such as residual polymers, contamination of support fractures, and impact on construction reliability, so as to avoid continuous viscosity reduction and stable Effect of Temperature Resistance and Shear Resistance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0052] Add 90m3 water into the container with a total capacity of 100m3 on site, start the vacuum jet pump circulation, slowly add 250Kg hybrid fenugreek powder through the suction port of the jet pump, and then add 50Kg crude oil demulsifier, 300Kg drainage aid, and 100Kg fungicide respectively , 500Kg clay stabilizer, and continue to circulate until the liquid is fully mixed to form a fracturing fluid base fluid L1 with a hybrid fenugreek powder concentration of 0.25%.
[0053] During fracturing construction, while pumping solution L1, mix 300Kg borate and base fluid L1 at the ratio of "base fluid L1: borate = 100Kg: 0.3Kg" to form fracturing fluid and use it for well temperature The oil layer at 25°C is subjected to fracturing stimulation.
Embodiment 2
[0055] Dissolve 30Kg of ammonium persulfate and 30Kg of sodium sulfite in 300K water, then mix with 300Kg of borate to form a cross-linking solution M.
[0056]Add 90m3 water into the container with a total capacity of 100m3 on site, start the vacuum jet pump circulation, slowly add 250Kg hybrid fenugreek powder through the suction port of the jet pump, and then add 50Kg crude oil demulsifier, 300Kg drainage aid, and 100Kg fungicide respectively , 500Kg clay stabilizer, and continue to circulate until the liquid is fully mixed to form a fracturing fluid base fluid L2 with a hybrid fenugreek powder concentration of 0.25%.
[0057] During fracturing construction, while pumping solution L2, mix crosslinking fluid M and base fluid L2 at the ratio of "base fluid L2: crosslinking fluid M = 100Kg: 0.6Kg" to form fracturing fluid and use it in wells Oil reservoirs with a temperature of 25°C are subjected to fracturing stimulation. the
Embodiment 3
[0059] Add 90 m3 of water to a container with a total capacity of 100 m3 on site, start the vacuum jet pump circulation, slowly add 300 Kg of hybrid fenugreek powder through the suction port of the jet pump, and then 500Kg of drainage aid, 100Kg of fungicide, and 500Kg of clay for stabilization agent, 500Kg foaming agent, and continue to circulate until the liquid is fully mixed to form a fracturing fluid base fluid L3 with a hybrid fenugreek rubber powder concentration of 0.3%.
[0060] During fracturing construction, while pumping solution L3, mix 400Kg of borate and base fluid L3 at the ratio of "base fluid L3: borate = 100Kg: 0.4Kg" to form fracturing fluid and use it for well temperature The natural gas wells at 30°C were fractured.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com