Large-scale deep foundation pit slope remaining soil digging and pit-in-pit concrete post casting construction method

A concrete and pit-in-pit technology, which is applied in infrastructure engineering, excavation, construction, etc., can solve the problems of long exposure time of foundation pits, high construction risks, and high costs, so as to facilitate construction speed, reduce safety risks, and excavate soil fast effect

Inactive Publication Date: 2014-05-28
ZHONGTIAN CONSTR GROUP
View PDF8 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] For a long time, the construction cost control and safety of large-scale deep foundation pits have become the focus and difficulty of developers and construction units. Both the support design and construction units adopt relatively conservative support and soil extraction methods for trestle bridges, and large deep foundation pits generally need to be dug 3 to 5 meters further down in the elevator shaft. If the deeper parts are constructed first The base plate is re-constructed with the traditional process of excavating the base plate with a shallow depth, so that the foundation pit construction is not only long-term and costly, but also has a long exposure time of the foundation pit and high construction risks.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Large-scale deep foundation pit slope remaining soil digging and pit-in-pit concrete post casting construction method
  • Large-scale deep foundation pit slope remaining soil digging and pit-in-pit concrete post casting construction method
  • Large-scale deep foundation pit slope remaining soil digging and pit-in-pit concrete post casting construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0021] The engineering objects suitable for this construction method are mainly those whose excavation depth is greater than 10 meters, the support structure adopts horizontal support and the construction period is relatively tight, there are many surrounding pipeline buildings, high safety requirements, and the conditional setting of the first-grade slope (1:10) The above foundation pit works. It is especially suitable for the earthwork excavation and foundation pit construction of the foundation pit project where the elevator shaft is set in the middle of the foundation pit and the elevator shaft is more than 5 meters deeper than the excavation of the surrounding foundation pits.

[0022] This construction method is to use the excavation and transportation method of retaining the slope to excavate the earth during the construction of large deep foundation pits. When the earthwork in the foundation pit is dug to a certain depth (generally after 10 meters), it is necessary to s...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a large-scale deep foundation pit slope remaining soil digging and pit-in-pit concrete post casting construction method, which is characterized in that the earthwork digging comprises the following steps including 1, first layer earthwork digging: the first layer earthwork digging is potted digging; 2, second layer earthwork digging: the second layer earthwork digging is slope remaining digging; 3, third layer earthwork digging: a method that a concrete earthwork slope passage is arranged at the left side of a middle trestle and an automobile directly runs into the passage for loading soil is adopted; 4, slope remaining part earthwork digging; 5, pit-in-pit earthwork digging; 6, pit-in-pit concrete casting construction after the pit-in-pit earthwork digging completion. The large-scale deep foundation pit slope remaining soil digging and pit-in-pit concrete post casting construction method has the advantages that the concrete post casting construction method is adopted, the construction difficulty is small, the cost is low, in addition, the construction period is short, and the risk is low.

Description

technical field [0001] The invention relates to the construction of large deep foundation pits. Background technique [0002] For a long time, the construction cost control and safety of large-scale deep foundation pits have become the focus and difficulty of developers and construction units. Both the support design and construction units adopt relatively conservative support and soil extraction methods for trestle bridges, and large deep foundation pits generally need to be dug 3 to 5 meters further down in the elevator shaft. If the deeper parts are constructed first The base plate is re-constructed with the traditional process of excavating the base plate with a shallow depth, so that the foundation pit construction is not only long-term and costly, but also has a long exposure time of the foundation pit and high construction risks. Contents of the invention [0003] The technical problem to be solved by the present invention is to provide a large-scale deep foundatio...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E02D17/02E02D17/04E02D15/02
Inventor 徐晓忠陈志远谢永章廖小军陆建飞赵鸣斯勇
Owner ZHONGTIAN CONSTR GROUP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products