Method and device for scheduling multi-core resource
A scheduling method and a technology of a scheduling device, which are applied in the communication field and can solve problems such as low business processing efficiency of a multi-core system
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0023] The specific implementation manners of a multi-core resource scheduling method and device provided in the embodiments of the present invention will be described below with reference to the accompanying drawings.
[0024] A method for scheduling multi-core resources provided by an embodiment of the present invention is applied to a multi-core system including a management core and multiple functional cores, such as figure 1 As shown, the method specifically includes the following steps:
[0025] S11: The management core determines the load status of the functional cores of each pipeline stage according to the received load information sent by the functional cores of each pipeline stage according to the preset cycle, and the number of functional cores of each pipeline stage;
[0026] S12: If it is determined that the load state of any functional core in any pipeline stage is an overload state, select the first set number of functional cores from the preset first ready cor...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com