Comprehensive monitoring method of urban railway traffic network facilities
A technology for urban rail transit and rail transit road network, applied in the fields of railway traffic management, railway car body parts, railway signal and safety, etc., can solve the problems that cannot meet the needs of the road network center for monitoring line equipment, and achieve network saving The effect of laying costs, reducing the amount of data transmission, and saving bandwidth resources
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0024] see Figure 2 ~ Figure 4 , the urban rail transit road network equipment comprehensive monitoring method of the present invention, for acquiring real-time state information of each line equipment from the rail transit road network data center, including normal state and fault state; performing data classification, data screening and data logic operation on the equipment state data ,in:
[0025] Data classification: It is to divide all the equipment status information obtained according to the five majors of comprehensive monitoring, signal, automatic fare collection, communication and vehicle; or, according to the system, it is divided into environment and equipment monitoring system (BAS), fire alarm system (FAS), power monitoring system (PSCADA), access control system (ACS), screen door system (PSD), closed circuit television system (CCTV), broadcasting system (PA), passenger guidance information system (PIS);
[0026] Data screening: Filter the data after the divis...
Embodiment 2
[0030] The urban rail transit road network equipment comprehensive monitoring method of this embodiment is different from Embodiment 1 in that: further, when performing data logic operations, when the logical state is a failure, by associating the logical state with the actual state, It can be traced back to which line equipment the actual alarm record caused the logical state to be fault.
Embodiment 3
[0032] see figure 2 , image 3 , the urban rail transit road network equipment comprehensive monitoring method of this embodiment is different from embodiment 1 or embodiment 2, further, such as Figure 4 As shown, the data logic operation includes: taking the line as the unit, performing logical operations on the equipment belonging to each line, and the result of the operation is used as the state of the line; The result of logic operation and re-operation is the professional status that needs to be monitored.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com