Assembly scheduling method of aircraft
A scheduling method and aircraft technology, applied in the field of aircraft
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0091] The given problem is shown in Table 3 below. The information in the table includes assembly sequence, active pre-nodes, duration and number of workers, etc.
[0092] Table 3: Problem description
[0093]
[0094]
[0095] In Table 3, similar to Table 2, the A0 number represents the item number of the assembly activity and the name A0 represents the item name of the assembly activity. The null front node indicates that there is no higher priority than the assembly activity represented by the item number. For assembly activities, the number in the front node represents the entry number of the assembly activity with higher priority. In addition, standard working hours represent the time required for the assembly activity; the number of people represents the number of people required for the assembly activity; the section name represents the name of the assembly section of the aircraft. For example, the number 1 represents the nose of the aircraft, 2 represents the fuselage of t...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com