Structure and connecting and construction method for buoyancy dam type emergency water retaining small dike
A technology of water particles and buoyancy, applied in dikes, dams, coastline protection, etc., can solve the problems of high unit cost, insufficient performance, and increase of the average unit weight of the mobile buoyancy dam.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0034] Rapid Construction of Emergency Water Retaining Dike for Flood Control Using Buoyancy Dam Type Emergency Water Retaining Dike
[0035] Build methods such as figure 2 Shown: 1. At a certain distance from the top of the embankment to the water side of the embankment, a row of anchor piles 3 is laid along the embankment; 2. On the embankment surface behind the piles, the sub-dikes are unfolded one by one along the embankment, and the foundation dam is laid in 2 parts Forward, part 1 of the retaining dam body is behind; 3. Align the left and right ends of each two adjacent sub-dikes, and first use nylon cable ties (1*8*200) to pass through the left and right ends of the two sections of dam cloth to correspond Tighten the nylon buckle, tie the end ropes 14 at the left and right ends of the two joints tightly together, and then fasten the two joints of the top side rope and the bottom side rope with shackle sleeves correspondingly, Finally, the end lapping cloths 15 at the ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com