Technological process of ground prefabrication and installation of inner shaft wall of freezing shaft

An installation process and a technology for freezing wells, which are applied in vertical shaft equipment, wellbore lining, earthwork drilling, etc., can solve problems such as hidden dangers in the safety and waterproof performance of single-layer well walls, high construction costs, and large well wall thickness, and reduce Downhole operation time, safe and reliable construction, and the effect of reducing the thickness of the inner wall

Active Publication Date: 2015-03-04
BEIJING CHINA COAL MINE ENG CO LTD
View PDF8 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The disadvantage is that there are hidden dangers in the safety and waterproof performance of the single-layer well wall during use.
[0006] To sum up, the current frozen shaft walls mostly adopt double-layer shaft wall structure design, which has the defects of excessive thickness of the shaft wall and high construction cost. Moreover, after the construction of the inner casing wall is completed, the steel bars are bound according to the section height and Concrete pouring and other processes that need to be carried out simultaneously in the construction project take a long time

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Technological process of ground prefabrication and installation of inner shaft wall of freezing shaft

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0022] The ground prefabrication and installation process of the inner layer of the frozen shaft wall of the present invention mainly includes the following steps:

[0023] ① Shaft wall prefabrication: While the shaft is being excavated, the inner shaft wall is prefabricated on the ground. In the shaft wall prefabrication step, the shaft wall is reinforced concrete shaft wall or inner steel plate composite shaft wall, and the shaft wall is made on the ground Fabricate section by section on the basis of leveling;

[0024] ② Well wall installation: After the prefabrication of the inner well wall is completed, the annular U-shaped steel is welded and assembled with the inner steel bars of the well wall body, so that the U-shaped steel and the main body form an integrated structure;

[0025] ③Sinking shaft wall: After the outer wall of the shaft is built, inject counterweight liquid into the well, so that the prefabricated inner well wall can sink slowly and control its suspension...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

A technological process of ground prefabrication and installation of an inner shaft wall of a freezing shaft comprises the following steps of performing prefabrication of a shaft wall; prefabricating the inner shaft wall on the ground at the same time of shaft excavation; performing installation of the shaft wall; performing welding assembly on annular U-section steel and rebar in a shaft wall body to enable the shaft wall body to form an integral structure after achieving prefabrication of the inner shaft wall; sinking the shaft wall; injecting counterweight liquid to a shaft after achieving masonry of an outer wall of the shaft to enable the prefabricated inner shaft wall to be slowly sunk and control the suspension height of the inner shaft wall in the counterweight liquid; installing the next section of the shaft wall and performing alignment when performing the installation of the shaft wall; performing welding after the alignment; performing wall backfilling; filling grouting in annular space between an inner wall and the outer wall into a plurality of stage heights from bottom to top; and performing consolidation to achieve shaft-forming. The technological process of the ground prefabrication and installation of the inner shaft wall of the freezing shaft has the advantages of reducing construction costs, saving construction time, speeding up the shaft-forming and guaranteeing the safety and reliability of the construction process.

Description

technical field [0001] The invention relates to the technical field of using a freezing method to construct shaft walls in the construction of mine shafts, in particular to a ground prefabrication and installation process for the inner shaft walls of frozen shafts in mine shafts. Background technique [0002] The vertical shaft shaft is the throat of the mine. In order to ensure safety, the shaft wall must be able to resist the effects of water pressure and formation deformation pressure, and must have good water sealing performance. [0003] At present, except for a few frozen wellbores in foreign countries, in the wellbore construction at home and abroad, one way is to use double-layer composite wellwall with plastic interlayer. This existing double-layer composite wellbore contains two layers inside and outside. Formation conditions, wellbore net diameter and buried depth, and the main factors affecting the thickness of the inner wellbore wall are the structure of the wel...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21D5/04E21D5/06
Inventor 刘志强王建平王恒刘晓敏姜浩亮杨明红刘伟民许舒荣陈红蕾高伟李志军温汉宏叶玉西石红伟赵玉明郭垒张绪忠
Owner BEIJING CHINA COAL MINE ENG CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products