Calculation method of entire-life-cycle based transformer cost risk
A technology with full life cycle and calculation method, applied in calculation, instrument, special data processing application, etc., can solve problems such as high maintenance cost and transformer replacement.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0050]The preferred embodiments will be described in detail below in conjunction with the accompanying drawings. It should be emphasized that the following description is only exemplary and not intended to limit the scope of the invention and its application.
[0051] According to the characteristics of transformer equipment, the present invention divides the transformer cycle cost into initial cost (C I ), operating cost (C O ), maintenance cost (C M ), failure cost (C F ) and scrapping costs (C D ). Therefore, the transformer life cycle cost can be expressed as:
[0052] LCC=C I +C O +C M +C F +C D
[0053] The initial cost mainly includes transformer purchase cost, installation cost, land renovation cost, commissioning cost and corresponding labor cost. The purchase cost includes equipment purchase cost, special tools and initial spare parts, etc. In order to simplify the calculation of the initial cost can be approximately replaced by the cost of purchasing eq...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com