Method and system for optimizing scheduling for short-term combined generation of cascade reservoir group

A technology for optimal dispatching and cascade reservoirs, applied in instrumentation, data processing applications, calculations, etc., and can solve problems affecting the computational efficiency of models and algorithms and the rationality of results.

Inactive Publication Date: 2013-01-02
GUIZHOU WUJIANG HYDROPOWER DEV
View PDF3 Cites 54 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Since the short-term power generation optimization dispatch of cascade hydropower stations involves many constraints such as the power station itself and unit output distribution, load vibration area, grid load transmission and PSS, and even requires 15 minutes as the long dispatch period, this greatly affects the calculation efficiency of the model and algorithm and the plausibility of the results

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method and system for optimizing scheduling for short-term combined generation of cascade reservoir group
  • Method and system for optimizing scheduling for short-term combined generation of cascade reservoir group
  • Method and system for optimizing scheduling for short-term combined generation of cascade reservoir group

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0069] Embodiment of the present invention: a cascade reservoir group (Wujiang River Basin) short-term combined power generation optimization dispatching method, such as figure 1 , figure 2 shown, including the following steps:

[0070] S1, the dispatching server establishes and stores two short-term optimal dispatching models, the maximum cascade power generation model and the maximum cascade energy storage model;

[0071] S2. The dispatching server selects a short-term optimal dispatching model according to the power generation optimization goal;

[0072] S3, the data collection device collects the model to solve the material, and the scheduling server selects an algorithm to solve the short-term optimal scheduling model;

[0073] S4. The dispatching server generates and outputs an optimal short-term power generation dispatching plan.

[0074] If the goal of power generation optimization is to maximize the total power generation of cascade power stations in a dispatch pe...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a method and a system for optimizing scheduling for short-term combined generation of a cascade reservoir group. The method comprises the following steps: S1) establishing and storing two short-term optimizing scheduling models, namely, a maximum cascade generating capacity model and a maximum cascade energy storage model, by a scheduling server; S2) selecting a short-term optimizing scheduling model according to a generating optimizing target by the scheduling server; S3) collecting model solving materials by a data collecting device, and selecting an algorithm for solving the short-term optimizing scheduling model by the scheduling server; and S4) generating and outputting a short-term generating scheduling optimizing scheme by the scheduling server. According to the method provided by the invention, the benefit and the speed are both considered while an optimizing scheduling model for a cascade hydropower station and a solving algorithm are searched, and the optimal optimizing scheduling scheme for the short-term combined generation of the cascade reservoir group is achieved.

Description

technical field [0001] The invention relates to a cascade reservoir group short-term combined power generation optimization dispatching method and system, belonging to the cascade reservoir group power generation optimization dispatching field. Background technique [0002] The short-term power generation optimization dispatch of cascade hydropower stations is a very complex system engineering problem. Its core is to establish an optimal dispatch model that can fully reflect the physical characteristics and operating mechanism of the system on the basis of fully considering the constraints of short-term dispatch hydraulic power and electric power. Find a model solving algorithm that meets the requirements of scheduling timeliness and rationality. The short-term dispatch cycle is shorter and closer to the actual operating conditions of the reservoir hydropower station. Its task is to determine the operating status of each hydropower station or the power grid in the next sche...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q50/06
Inventor 戴建炜黄强朱江吴成国肖燕曹辉李泽宏王敏
Owner GUIZHOU WUJIANG HYDROPOWER DEV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products