Compensation method for roadbed settlement
A compensation method and roadbed technology, applied to roads, roads, buildings, etc., can solve problems such as large climate impact, inability to construct, and interference with vehicle traffic, and achieve the effect of short construction time and less traffic interference
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0019] The subgrade section at the bridgehead of K2+300~K2+320 of an expressway has a length of 20m and a width of the top surface of the subgrade of 26m. During the roadbed construction, when the roadbed is filled to a height of 80cm from the top surface of the roadbed, retaining walls shall be built on both sides of the roadbed. The bottom surface of the retaining wall is 50cm lower than the bottom surface of the bagged quicklime paving, and the top surface of the retaining wall is flush with the top surface of the roadbed. The width of the subgrade between the two retaining walls is 24m.
[0020] Within the full width of the subgrade inside the retaining wall, 1,000 bags of quicklime were evenly paved in 4 layers on each layer. Calcium quicklime is used, the calcium oxide content is 80%; the water content is 0.8%.
[0021] Quicklime is packaged in airtight, deformable rubber bags. The quality of each bag of quicklime is 250kg. Connect a rubber tube to the outside of the...
Embodiment 2
[0027] The subgrade section at the bridge head of an expressway K30+500~K30+540 has a length of 40m and a width of 26m at the top of the subgrade. During the roadbed construction, when the roadbed is filled to a height of 60cm from the top surface of the roadbed, retaining walls shall be built on both sides of the roadbed. The bottom surface of the retaining wall is 20cm lower than the bottom surface of the bagged quicklime paving, and the top surface of the retaining wall is flush with the top surface of the roadbed. The width of the subgrade between the two retaining walls is 24m.
[0028] Within the full width of the subgrade inside the retaining wall, 2,000 bags of quicklime were evenly paved in 3 layers on each layer. Magnesia quicklime is used, with a magnesium oxide content of 98% and a water content of 0.5%.
[0029] Quicklime is packaged in airtight, deformable rubber bags. The quality of each bag of quicklime is 300kg. Connect a rubber tube to the outside of ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com