Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

CTCS-3-level train control center system

A train control center and train control technology, which is applied in the field of rail transit technology and communications, can solve the problems of incomplete application and the train control center does not have the function of sending rail circuit codes, so as to reduce costs and construction difficulties and improve reliability. sexual effect

Active Publication Date: 2012-01-18
CHINA RAILWAYS CORPORATION +1
View PDF3 Cites 48 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] In the prior art, the train control center in the 200km / h speed-up section of the existing line only realizes the transmission of train route information and temporary speed limit information. The train control center does not have the code sending function for the track circuit

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • CTCS-3-level train control center system
  • CTCS-3-level train control center system
  • CTCS-3-level train control center system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0018] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments It is a part of embodiments of the present invention, but not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.

[0019] figure 1 It is a structural schematic diagram of Embodiment 1 of the CTCS-3 train control center system of the present invention, as figure 1 As shown, this embodiment provides a CTCS-3 train control center system, which may specifically include a train control center (Train Control Center; TCC for short) 101 and track circuit equipment 10...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a CTCS (China Train Control System)-3-level train control center system, comprising a TCC(Train Control Center). The TCC is used for carrier frequency and low frequency coded commands to a rail circuit device, and receiving rail section state information and device state information returned by the rail circuit device; the TCC is further used for transmitting coded information to the rail circuit device according to route information provided by a CBI (Channel Bus In), the rail section state information and the device state information, and the rail circuit device transmits movement authority information to the train according to the coded information; and the rail circuit device transmits a temporary speed restriction command to the train through an active transponder according to the temporary speed restriction command t transmitted by a TSRS (Temporary Speed Restriction Server). The rail circuit device is used for transmitting the movement authority information to the train according to the coded information. With the CTCS-3-level train control center system, the safety and the reliability of a high-speed railway train operation control system are both improved, and equipment cost and construction difficulty are both reduced.

Description

technical field [0001] The invention relates to rail transit technology and communication, in particular to a CTCS-3 train control center system. Background technique [0002] With the construction of Chinese Train Control System-3 (hereinafter referred to as: CTCS-3) level high-speed railway, the running speed of high-speed EMU has reached more than 350km / h, so the signal control system of high-speed train is also Higher technical requirements are put forward to realize the overspeed protection of high-speed railway EMUs and ensure the safety of EMUs. The train control center is the core equipment in the ground train control system. It needs to realize the functions of track circuit occupancy inspection, track circuit code sending control, train route information transmission, temporary speed limit information transmission, section block direction control, etc., to ensure that CTCS- Safe and reliable operation of Level 3 train control system. [0003] In the prior art, th...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): B61L27/00B61L27/04H04B1/59
CPCB61L2027/0044B61L3/246B61L27/0038B61L2027/202B61L27/20
Inventor 季学胜覃燕袁湘鄂唐抗尼李凯张季良李光东叶峰郭军强刘长波杨海涛赵文丽
Owner CHINA RAILWAYS CORPORATION
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products