Method for drawing joint scheduling graph of step reservoir
A technology of joint dispatching and cascade reservoirs, applied in water conservancy projects, hydroelectric power generation, hydroelectric power stations, etc., can solve the problems of low availability and weak concept.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0016] In order to make the above objects, features and advantages of the present invention more comprehensible, the present invention will be further described in detail below in conjunction with the accompanying drawings.
[0017] The present invention is mainly aimed at the lack of intuitive dispatching guidance tools in the joint dispatching of cascade hydropower stations. The implementation of the cascade reservoir joint dispatching diagram generation method developed by the present invention includes the division of reservoir water supply and storage periods, the selection of typical runoff processes, etc. Efforts shall be made to formulate the dispatching diagrams of each reservoir (including the drawing of the initial dispatching diagrams of the upstream cascade leading reservoirs and the drawing of the initial dispatching diagrams of the downstream reservoirs), the drawing of the initial dispatching diagrams of the cascade joint dispatching, the optimization calcu...
PUM

Abstract
Description
Claims
Application Information

- Generate Ideas
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com