Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Stope bottom structure suitable for underground two-step mining and production process thereof

A bottom structure and stope technology, applied in underground mining, surface mining, earthwork drilling, etc., can solve the problems of high mining accuracy ratio, large cutting ratio of bottom pillars, and long stope preparation time.

Active Publication Date: 2011-04-13
SINOSTEEL MAANSHAN INST OF MINING RES
View PDF5 Cites 40 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] These two bottom structures have a large amount of work, and the cutting ratio of the bottom pillar is large, which affects the stability of the bottom pillar and increases the amount of support work.
The two-step recovery has a high cutting-to-cutting ratio and takes a long time to prepare the stope, which affects the comprehensive production capacity of the stope
At present, there is no publicized bottom structure design method that can be used for two stopes in China. In December 2006, "Mining Technology" disclosed a method for optimizing the structure parameters of a stope. It adopts a flat bottom structure and serves for a single stope. field
This kind of bottom structure has a high mining ratio and cannot meet the requirements of thick and large ore bodies, distributed mining and large mining equipment.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Stope bottom structure suitable for underground two-step mining and production process thereof
  • Stope bottom structure suitable for underground two-step mining and production process thereof
  • Stope bottom structure suitable for underground two-step mining and production process thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0044] In order to further describe the present invention, a stope bottom structure suitable for downhole two-step recovery and its production process will be further described in detail below in conjunction with the accompanying drawings and embodiments.

[0045] figure 1 It is a longitudinal projection diagram of the stope bottom structure suitable for the two-step downhole recovery of the present invention.

[0046] figure 2 This is a horizontal projection of stope bottom structure suitable for downhole two-step recovery.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a stope bottom structure suitable for underground two-step mining and a production process thereof. An underground stope is divided into a room stope and a pillar stope. Bottom pillars are reserved according to the bottom structure forms. Along-vein travelling roadways (4) and across-vein ore-drawing roadways (6) are utilized to handle the ores. The blasting ores (11) in the stope are blasted and fall in trenches (12). A scraper pours the ores into an ore pass (5) via a common ore-drawing drift (9) and a room ore-drawing drift (10). After tailing-cemented filling of the room of the stope, new pillar undercutting roadways (8) are driven in the bottom pillars (3) during mining the pillar stope. The trenches (12) for room mining are formed through drilling and blasting and undercutting. The goafs formed after mining and ore-drawing of pillars (2) are filled. The stope bottom structure can serve two stopes, reduce the quantities and support quantity, reduce the mining and development ratio of mining, improve the stability and save the mining cost and preparation time of two-step mining.

Description

technical field [0001] The invention relates to a stope bottom structure and a production process of an underground mine, in particular to a stope bottom structure suitable for underground two-step recovery and a production process thereof. It is suitable for all kinds of mines to use tailings filling for step-by-step back mining operation with trackless equipment, realize the sharing of the stope exit route, reduce the engineering quantity of the bottom structure and the mining preparation time of the two-step stope stope. Background technique [0002] The bottom structure of the ore block is an important component of the mining method, and the bottom structure of the stope has a great influence on the technical and economic effects of the mining method and the safety of the mining work. According to statistics, the labor consumption for forming the bottom structure of the mine underground stope accounts for 20-40% of the total labor consumption per ton of ore. Therefore, a...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21C41/22
Inventor 胡永泉张传信郭金峰赵继银叶振华张鹏
Owner SINOSTEEL MAANSHAN INST OF MINING RES
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products