Construction method for reinforcing soft formation in shield construction
A technology of weak ground and construction methods, applied in underground chambers, earthwork drilling, wellbore lining, etc., can solve complex and changeable geology, endanger equipment, personnel safety and other problems, meet the requirements of simple, short reinforcement period, age short effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0010] This construction method has been successfully used in the 2203 mark of Shenzhen Metro Line 2, and the application effect is good. The starting of the shield tunneling has been successfully completed. At the reinforcement position of the communication channel, the cabin has been opened at atmospheric pressure, and the maintenance and replacement of tools has saved the construction period. The entire project has been basically completed, increasing social and economic benefits, ensuring the progress and safety of the project, and has been widely praised.
[0011] The construction method includes plain diaphragm wall and single-pipe rotary grouting pile construction. The main construction process is as follows:
[0012] Plain Diaphragm Wall Construction:
[0013] The construction of plain diaphragm wall mainly includes surveying and setting out, construction of guide wall, preparation and use of mud, construction of groove, and pouring of underwater concrete.
[0014] (1...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com