Process for pre-assembling bow thrustor on ship body section

A hull and pre-installation technology, applied in the field of ship construction, can solve the problems of delaying the hull manufacturing period, economic losses of manufacturers, wasting time and manpower, etc., and achieve the goal of reducing the workload of turning over, shortening the construction period, and reducing the time for positioning Effect

Active Publication Date: 2009-12-09
JIANGNAN SHIPYARD GRP CO LTD
View PDF0 Cites 20 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] Due to the high installation accuracy requirements of the bow thruster, it is often necessary to perform repeated positioning many times when using the above-mentioned reverse method to install the bow thruster. The positioning is difficult and takes a long time, and sometimes a lot of time may be wasted. time and manpower, the production efficiency is low, and in severe cases, it may even delay the manufacturing period of the entire hull, causing economic losses to the manufacturer

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Process for pre-assembling bow thrustor on ship body section
  • Process for pre-assembling bow thrustor on ship body section
  • Process for pre-assembling bow thrustor on ship body section

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0018] The present invention will be described in detail below in conjunction with the accompanying drawings, based on a pre-installation process of a bow thruster of a container ship on a hull segment.

[0019] Such as figure 1 , 2 As shown, the container hull section is divided into a lower subsection 1, a middle subsection 2 and an upper subsection 3 according to different working platforms, wherein the lower subsection 1 is used for installing the bow thruster 5.

[0020] During the pre-installation process of the hull section of the bow thruster of the container ship, the lower subsection 1, the middle subsection 2, and the upper subsection 3 of the hull section are first manufactured inversely based on different platforms. Scattered and attached to the outer plate, the so-called anti-state here is exactly the opposite of the state when the hull is running normally. Wherein the lower subsection 1 can change some parts into bulk parts when carrying out reverse state manu...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a process for pre-assembling a bow thrustor on a ship body section, which comprises the following steps: manufacturing the bow thrustor; reversely manufacturing an upper subsection, a middle subsection and a lower subsection; turning over the lower subsection to a normal state, and then assembling the bow thrustor on the lower subsection; reversely folding the upper subsection and the middle subsection; and turning over the obtained folding section to the normal state, and normally folding the folding section and the lower subsection. The pre-assembling process reduces the positioning difficulty of the bow thrustor during assembling, and reduces the time for positioning the bow thrustor so as to shorten the construction period of a ship body.

Description

technical field [0001] The invention relates to a ship building method, in particular to a pre-installation process of a ship bow thruster on a ship hull section. Background technique [0002] With the development of science and technology and the needs of modern waterway transportation, the volume of ships built now is also becoming larger and larger. Since the volume of the ship becomes huge, the hull cannot be built as a whole under such circumstances. It can only be constructed by dividing the hull into several blocks. These blocks are called sections. After segmentation, each section is preassembled, and then the preassembled sections are positioned and closed to build the entire hull. Therefore the quality of each subsection preloading quality is often also directly related to the quality of the hull itself. Due to the limitations of the hull structure, the pre-installation of the existing hull segments is generally performed in an inverted state. The so-called inver...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): B63B9/00B63B9/06
Inventor 刘保华
Owner JIANGNAN SHIPYARD GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products