Integral hoisting system for superaltitude overlong jumbo beam by truss method and construction method thereof
A technology of overall lifting and construction methods, applied in bridges, bridge construction, erection/assembly of bridges, etc., can solve problems such as the inability to realize three-dimensional operations and the safety hazards of falling objects from high altitudes
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0020] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0021] For example, the upper beam of a bridge tower is a prestressed reinforced concrete cavity beam structure spanning the left and right tower columns. The beam is 9 meters high, 43.8 meters long and 8 meters wide. It is a super-high-altitude super-long giant beam structure,
[0022] Such as figure 1 As shown, the overall lifting system of the super-high-altitude super-long giant beam truss method of the present invention includes a lifting bracket 1, a formwork truss 2 and a lifting power system 3, and the formwork truss 2 includes a main body truss 21 and an end fixed truss 22. The end fixed trusses 22 are fixed on the vertical structures 4 on both sides of the giant beam 5, the lifting bracket 1 is fixedly arranged on the fixed trusses 22 at both ends, the lifting power system 3 is fixed on the lifting bracket 1, and the lifting power The system...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com