Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Method for configuring core resources in multi-core system, multi-core system and management core

A multi-core system and nuclear resource technology, applied in the field of multi-core processors, can solve problems such as bottlenecks in the IP processing stage, waste of nuclear resources, system problems, etc., and achieve the effect of improving business processing efficiency

Active Publication Date: 2008-03-19
北京紫光通信科技集团有限公司
View PDF0 Cites 23 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The system will run normally when the network traffic is normal, but when some unusual business traffic suddenly increases on the network, the system may have problems
For example: when a large number of IP fragmented packets suddenly appear on the network, because the IP fragmented packets need to be reassembled in the IP processing stage, the load of the core in the IP processing stage will increase sharply, and at the same time, due to the reorganization of the packets, the IP processing stage will transfer to TCP The packets transmitted in the processing stage are relatively reduced, so the load on the core in the TCP processing stage is reduced accordingly, and it may even be in an idle state for a long time. Similarly, the load on the core in the APP processing stage is also reduced, resulting in a bottleneck in the entire system in the IP processing stage. At the same time, the cores in the TCP and APP processing stages are not fully utilized, resulting in a waste of core resources
[0004] From the above, due to the prior art, once the multi-core system is started, the functions of each core will not change, so the number of cores occupied by each stage of the pipeline will not change, so when the core of a certain stage When the load suddenly increases, it is likely to cause a system bottleneck, which makes the business processing efficiency of the multi-core system low

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for configuring core resources in multi-core system, multi-core system and management core
  • Method for configuring core resources in multi-core system, multi-core system and management core
  • Method for configuring core resources in multi-core system, multi-core system and management core

Examples

Experimental program
Comparison scheme
Effect test

specific Embodiment approach

[0049] Fig. 3 is a flow chart of adding supplementary cores to the overload pipeline stage provided by the embodiment of the present invention, as shown in Fig. 3, the specific steps are as follows:

[0050] Step 301: the management core sends a reset command to the selected supplementary core.

[0051] Step 302: The supplementary core receives the reset command from the management core, stops receiving new services, and after completing the processing of the currently received services, sets its own operating status to the status to be reset, and the time to report the load value and operating status arrives , report its own load value and running status information to the management core.

[0052] Step 303: The management core receives the load value and running status information from the supplementary core, and detects that the running status information indicates that the supplementary core is in a state to be reset, and then sets the running environment of the supplement...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a method of allocating core resources on a multi-core system, which includes: pre-select a core as a management core in the multi-core system, with other cores as the function cores; when the management core detects the function cores in a production line phase in overload condition, according to the load information sent by the function cores in all production line phases, select one function core as the supplementation core from the function cores with low load condition in production line phases and add the supplementation core to the production line phase with the overload function cores. The invention also discloses the multi-core system and the management core and realizes the core resources occupation adjustment in all production line phases, according to the business load trend of all production line phases in the multi-core system, in order to improve the business processing efficiency of the multi-core system.

Description

technical field [0001] The invention relates to the technical field of multi-core processors, in particular to a method for configuring core resources on a multi-core system, a multi-core system and a management core. Background technique [0002] The emergence of multi-core processors greatly improves the performance of traditional single-core processors. However, with the rapid development of multi-core processors and the continuous enhancement of multi-core integration, the development of multi-core software technology is relatively lagging behind. In order to give full play to the advantages of multi-core, the industry chooses to run an operating system on each core of the multi-core processor or run a single-threaded application program that does not require operating system support. Each core completes a specific task, and multiple cores work together in a pipelined manner. The system allocates different numbers of cores to each stage of the pipeline according to requi...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): H04L29/02H04L12/24
Inventor 张晓明
Owner 北京紫光通信科技集团有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products