Drilling grout pile end follow-up grouting construction method

A technology of bored piles and construction methods, which is applied to sheet pile walls, foundation structure engineering, construction, etc., can solve problems such as the inability to form a unified construction method, and achieve the effects of simple structure, increased pile side friction, and convenient construction.

Active Publication Date: 2009-08-26
SHANGHAI FOUND ENG GRP
View PDF4 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In the initial stage of application in Shanghai, the post-grouting technology was often unable to form a unified and effective construction method due to differences in grouting equipment, grout materials, and construction techniques

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Drilling grout pile end follow-up grouting construction method
  • Drilling grout pile end follow-up grouting construction method
  • Drilling grout pile end follow-up grouting construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0032] Below in conjunction with specific embodiment, further illustrate the present invention. It should be understood that these examples are only used to illustrate the present invention and are not intended to limit the scope of the present invention. In addition, it should be understood that after reading the teachings of the present invention, those skilled in the art can make various changes or modifications to the present invention, and these equivalent forms also fall within the scope defined by the appended claims of the present application.

[0033] One. The post-grouting construction method of the bored pile pile end of the present invention, its construction process and operating points are as follows: figure 1 shown.

[0034] (1) Construction materials and equipment

[0035] Underground grouting device: pile body grouting conduit, pile end grouting device, etc.

[0036] (2) Determination of grouting depth and fabrication of grouting equipment

[0037] A. Prel...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a post-grouting construction method for ends of bored cast-in-place piles, in specific to steps as follows: (1) Grouting depth determination and grouting device maunfaucturing; (2) Grout fluid configuration; (3) Grouting. Kernel devices for the invented post-grouting construction method, such as grouting pipelines and etc, are characterized in simple structure and convenient execution; the method can take duplicated reinforcement effects for pile-earth boundary around pile bodies and pile ends in both physical reinforcement and chemical reinforcement; the solidified sludge can take the effect of diameter expansion for the pile ends, so as to change properties of bearing stratums; meanwhile, upwelled grout fluid can solidify the sludge skin around piles, in order to take effects in increasing pile side friction resistance. Since the invented method can well resolves defects in construction of boundaries between cast-in-place piles and earth; unit pile bearing capacity of cast-in-place piles adopting the pile end post-grouting construction method, in soft earth area like Shanghai, is fundamentally improved by 20 percent to 30 percent higher than that of routine cast-in-place piles, and several examples can even reach 70 percent extremely.

Description

technical field [0001] The invention relates to a grouting method in building construction, in particular to a post-grouting method for pile ends of bored piles. Background technique [0002] Since the 1980s, bored piles have been widely used in high-rise buildings and municipal construction because of their advantages such as simple construction, no soil extrusion, no vibration, and low noise. However, due to the formation of overly thick pile bottom sediment and pile side mud skin in the drilling process of the mud retaining wall, the hole wall is easily affected by disturbance and soaking in water, etc., resulting in the failure of pile quality and single pile bearing capacity. Discrete phenomena. Especially in the typical soft soil area of ​​Shanghai, if the bored pile passes through a thicker sand layer, and the diameter is larger and the pile length is longer, the quality of the pile is more difficult to guarantee. [0003] Post-grouting technology at pile tip is a n...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02D5/34
Inventor 袁芬李耀良赵伟成张云海张晓峰张敏佳袁振
Owner SHANGHAI FOUND ENG GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products