Engineered Wood Construction System for High Performance Structures
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Benefits of technology
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0029]FIG. 1 shows two load bearing wall panels P formed of engineered wood such as LVL. FIG. 2 shows four such wall panels. The wall panels P stand on a foundation F. The wall panels are tied to the foundation by tendons T. Typically a tendon T comprises a rod or bar or wire or group thereof, or a cable of steel or alloy or carbon fibre or other high tensile strength material. A tendon T passes through a longitudinally extending cavity through each wall panel P. The tendons T are fixed in or to the foundation F, and at the top of the wall panels P by being anchored to an anchoring device 5. For example a threaded end of each tendon may pass through a plate and be secured with a bolt on the other side. This also enables the prestress force applied by the tendon to be adjusted, and enables the prestress force in the tendon to be increased / adjusted at intervals during the life of the building. Anchoring devices in other forms may be utilised, which preferably also allow for adjustment...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com