Pedestrian and vehicle separated bridge structure
A technology of bridge structure and separation of people and vehicles, applied in the direction of bridges, bridge construction, bridge parts, etc., can solve problems such as the inability to ensure that vehicles and pedestrians do not interfere with each other, and achieve the effect of easy dismantling and replacement, and stable construction.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
refer to figure 1 and figure 2 , a bridge structure with separation of people and vehicles includes a bridge main body 1 , a pedestrian bridge 2 and a bridge tower 3 .
[0032] refer to figure 1 , the bridge main body 1 is a bridge body built by a box girder, the two ends of the bridge main body 1 are erected on the bridge platform, the bridge main body 1 spans the river and lake, the bridge main body 1 is for vehicles to pass, and the traffic direction of the vehicles on the bridge main body 1 is this application The traffic direction of the bridge main body 1.
[0033] refer to figure 1 and figure 2 , the pedestrian bridge 2 is an arc bridge, the pedestrian bridge 2 includes several arc-shaped assembled bridges 21, and the pedestrian bridge 2 is formed by splicing a number of assembled bridges 21; the bridge main body 1 is provided on both sides of the traffic direction. Both ends of the bridge 2 are erected on the bridge main body 1, and the bridge main body 1 is prov...
Embodiment 2
The difference between this embodiment and Embodiment 1 is that it also includes a support beam 4 , a connecting bridge 5 , a guard plate 6 , an isolation plate 7 and a hot air blower 8 .
[0038] refer to image 3 and Figure 4 , the supporting beam 4 is fixed with the bridge main body 1, and the bridge main body 1 extends a number of supporting beams 4 on both sides of the traffic direction. The number of 22 is the same, and a support beam 4 extends below a joint 22 .
[0039] refer to image 3 , the bridge main body 1 is a box girder. In this embodiment, the bridge main body 1 is a double-chamber box girder. The bridge main body 1 includes a bridge deck structure 11 and two beam boxes 12. The bridge deck structure 11 and the beam boxes 12 have a certain length. The directions are the same, the two beam boxes 12 are located under the bridge deck and are precast and formed, the two beam boxes 12 are connected to each other, and the side walls of the two beam boxes 12 connec...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com