Method for determining plugging length of horizontal well of fractured water breakthrough oil well and plugging method
A determination method and technology for horizontal wells, which are applied in the directions of sealing/isolation, wellbore/well components, earth-moving drilling, etc., which can solve the problem of affecting the recovery degree of oil reservoirs, reducing the drainage area of horizontal wells, and secondary inrush of injected water. And other issues
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0058] In this embodiment, taking the A1 well group with direct injection and horizontal production developed in the fractured reservoir of the H Oilfield as an example, the plugging length of the horizontal well of the fractured water breakthrough well is quantitatively optimized according to the method of the present invention.
[0059] The method for determining the plugging length of the horizontal well of the fractured water breakthrough oil well in this embodiment is as follows: figure 1 shown, including the following steps:
[0060] 1) Establish a dual-media 3D numerical model to characterize the characteristics of fractured reservoirs:
[0061] ①Use the electrical data and core data of all single wells in the target area (that is, the area where the A1 well group is located), and combine the regional sedimentary markers and the development of stable mudstone interlayers and physical interlayers to determine the sublayer division scheme; use the sublayer division scheme...
Embodiment 2
[0084] The method for determining the plugging length of the fractured water-through oil well and the horizontal well of the present embodiment is carried out in the following order according to the steps of Embodiment 1: step 3), step 1), step 2), step 4), step 5) , step 6).
Embodiment 3
[0086] The method for determining the plugging length of the fractured water breakthrough oil well and the horizontal well of this embodiment is only different from that of Embodiment 1 in that: the water flooding swept volume coefficient is calculated by using the cumulative oil production, comprehensive water content, and crude oil viscosity, etc. The calculation method of water drive volumetric sweep coefficient is:
[0087]
[0088] In the formula, E v is water flooding volumetric sweep coefficient; B oi is the crude oil volume coefficient in the initial state of the reservoir; B o is the volume factor of crude oil under current conditions; f w is the comprehensive water cut of the reservoir, %; N p is the cumulative oil production, 10 4 t; N is crude oil geological reserves, 10 4 t; μ w is formation water viscosity, mPa·s; μ o is the viscosity of crude oil, mPa s; S wi is bound water saturation, %; S or is the final residual oil saturation, %.
[0089] a, b a...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com