Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Intelligent drilling management system and method based on tunnel rail-mounted drilling robot

A management system and robot technology, applied in the field of tunnel drilling, can solve problems such as unfavorable dynamic control and automatic construction, difficulty in precise positioning of holes, and a large number of holes. Achieving overall quality effects

Pending Publication Date: 2022-04-08
CHINA CONSTR IND & ENERGY ENG GRP CO LTD
View PDF0 Cites 8 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

At present, the operation mode of manual marking and manual hand-held drilling assisted by the operation platform is still mainly used for opening holes in the tunnel wall, and the operation efficiency is low.
[0003] With the development of various automatic drilling robots on the market, manual drilling is gradually replaced by tunnel drilling robots, but a comprehensive drilling control system has not yet been formed. The existing tunnel drilling robots still have the following problems: Obtain the arrangement of steel bars in the concrete wall. There are differences between the actual tunnel and the BIM model, which leads to the hole location and punching based on the blueprint, which is easy to touch the steel bars, and the number of holes is large, which is easy to omit and make the investigation difficult, which affects the progress; the tunnel wall is cylindrical It is difficult to accurately locate the holes; it is impossible to grasp the process quality and progress of the holes in real time; it is impossible to realize automation and intelligence for drilling construction, and more stays in the mechanical application of drilling robots, with a large degree of manual intervention
Based on the above defects, the existing drilling robots are not clear about the overall drilling quality, progress and key point control of the tunnel, which is not conducive to the dynamic control and automatic construction of the construction process, and the construction is relatively inconvenient

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Intelligent drilling management system and method based on tunnel rail-mounted drilling robot
  • Intelligent drilling management system and method based on tunnel rail-mounted drilling robot

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0045] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments, but the protection scope of the present invention is not limited thereto.

[0046] In the description of the present invention, it should be understood that the orientation or positional relationship indicated by the terms "upper", "lower", "front", "rear" etc. is based on the orientation or positional relationship shown in the drawings, and is only for To facilitate the description of the present invention, it cannot be understood as a limitation of the present invention; the terms "installation", "connection", "fixation" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection, It may be directly connected, may also be indirectly connected through an intermediary, or may be internally connected between two elements; those skilled in the art can understand th...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

According to the intelligent drilling management system and method based on the tunnel rail-mounted drilling robot, on-line real-time monitoring of a drilling construction site is achieved, on the basis of visualization and data extractability of a BIM model, the drilling position is optimized based on the three-dimensional scanning technology, the hole operation sequence is optimized through construction simulation, and the construction efficiency is improved. And the construction quality is improved. A hole information coding scheme is provided, automatic hole coding software is researched and developed, uniqueness of hole pointing and attribute of key building information are achieved, information is converted into data to directly control operation, and compared with a common drilling robot, the automatic hole drilling robot has the advantages of being high in automation degree and construction efficiency, capable of saving manpower and the like. A double-coordinate system is adopted, accurate positioning and drilling are achieved, and the drilling quality is optimized; according to drilling positioning, real-time comparison of real object and model data is achieved, the overall drilling accuracy is improved, differentiation of feedback data after drilling is completed is processed, and the drilling quality is further guaranteed.

Description

technical field [0001] The invention belongs to the technical field of tunnel drilling, and in particular relates to an intelligent drilling management system and method based on a tunnel rail drilling robot. Background technique [0002] In recent years, my country's subway tunnel traffic construction industry has developed rapidly. The installation of traction power supply catenary, side wall cables, pipes, and side wall safety evacuation platforms in the tunnel requires a large number of installation holes to be drilled on the tunnel wall. At present, the operation mode of manual scribing and manual hand-held drilling assisted by the operation platform is still mainly used for opening holes in the tunnel wall, and the operation efficiency is low. [0003] With the development of various automatic drilling robots on the market, manual drilling is gradually replaced by tunnel drilling robots, but a comprehensive drilling control system has not yet been formed. The existing ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E21B7/02E21B7/04E21B47/00E21B47/02E21F17/00E21F17/18
CPCY02T10/40
Inventor 白蓉蓉许庆江梁洵石馨
Owner CHINA CONSTR IND & ENERGY ENG GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products