Ultra-deep narrow vertical shaft shield split launching construction method
A technology of split origination and construction method, applied in earth-moving drilling, mining equipment, tunnels, etc., can solve the problems of cross-influence between processes and low space utilization, achieve reasonable space utilization, save underground space, Clear timing effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0028] Example 1: A method for split-start construction of ultra-deep narrow shaft shield, see figure 1 and figure 2 , using a shield machine with an excavation diameter of 8.64m, the outer diameter of the lining segment in the shield section is 8.3m, the inner diameter is 7.5m, the ring width is 1.6m, and the thickness is 0.4m; each ring has 7 segments Composition, including 4 standard blocks, 2 connecting blocks, and 1 F block; the lining ring adopts a universal ring, the double-sided wedge shape is 46mm, and the number of supporting trailers behind the main machine of the shield machine is 6. The split-body starting construction method comprises the steps of:
[0029] (1) The first stage of the shield machine starting
[0030] ①Inoue Site Layout
[0031] According to the plan, hoist No. 1 to No. 6 trailers supporting the main engine of the shield machine in a U-shaped arrangement around the shaft, assemble and connect No. The pipeline, hydraulic oil pipeline, internal ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com