Construction method for full-casing full-slewing drilling machine pile foundation adjacent to subway

A technology of full rotary drilling rig and construction method, which is applied in basic structure engineering, excavation, sheet pile wall and other directions, can solve the problems of large soil disturbance, low safety, easy to collapse holes in subway tunnels, etc., so as to save construction period and improve Safety and the effect of not easily collapsing holes

Active Publication Date: 2021-11-19
CRPCEC SHENZHEN ENG +1
View PDF10 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] In related technologies, conventional bored pile construction schemes are usually used for pile foundation construction near the subway. Since bored piles are prone to collapse and other problems during the construction process, the disturbance to the soil around the subway tunnel is relatively large, and the safety lower

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for full-casing full-slewing drilling machine pile foundation adjacent to subway
  • Construction method for full-casing full-slewing drilling machine pile foundation adjacent to subway
  • Construction method for full-casing full-slewing drilling machine pile foundation adjacent to subway

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0045] The following is attached Figure 1-6 The application is described in further detail.

[0046] The embodiment of the present application discloses a pile foundation construction method of a full-casing full-rotary drilling rig adjacent to a subway.

[0047] combine Figure 1 to Figure 6 A construction method for a pile foundation with a full-casing full-rotary drilling rig adjacent to a subway, comprising the following steps:

[0048] S1, measuring and setting out:

[0049] After the site is leveled and compacted, the coordinate positioning method is used, and the total station is used to measure the axis, measure the line, and determine the pile position.

[0050] S2. The full-rotary drilling rig is in place:

[0051] First install the base of the rotary drilling rig with a crane, pull the cross line up on the round mouth of the base to align the center of the base with the center of the pile position, and then fix it so that the center of the base of the full-rotary...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction method for a full-casing full-slewing drilling machine pile foundation adjacent to a subway. The construction method comprises the following steps that S2, a full-slewing drilling machine is placed in place, the center of a base of the full-slewing drilling machine is aligned with the center of a pile placing position, and the base is adjusted to a horizontal state; S3, steel casing sections are connected on site to reach the preset length of a pile casing, and a drill bit is arranged at the end of the first steel casing section; S4, the pile casing is hoisted and the pile casing is connected with the full-slewing drilling machine; S5, the pile casing is vertically driven into a soil layer, a pile hole is sequentially divided into an upper section, a middle section and a lower section from top to bottom for construction, and the subway structure is located within the range of the middle section; S6, after the drilled hole reaches the required depth and the pile hole is checked to be qualified, the hole is cleaned; and S7, a reinforcement cage is hoisted, and in the hoisting process, the reinforcement cage is kept vertical all the time and is coaxial with the pile casing. The construction method for the full-casing full-slewing drilling machine pile foundation adjacent to the subway has the effects that disturbance of pile foundation construction to soil around the subway tunnel is reduced, hole collapse is not prone to occurring, and safety risks caused by pile foundation construction to the subway structure and subway operation are reduced.

Description

technical field [0001] The invention relates to the field of pile foundation construction adjacent to subways, in particular to a construction method for pile foundations of a full-casing and full-rotation drilling rig adjacent to subways. Background technique [0002] In recent years, with the rapid development of urban subways, the construction of buildings adjacent to subways has increased rapidly. [0003] In related technologies, conventional bored pile construction schemes are usually used for pile foundation construction near the subway. Since bored piles are prone to collapse and other problems during the construction process, the disturbance to the soil around the subway tunnel is relatively large, and the safety lower. [0004] Based on the above related technologies, it is necessary to propose a pile foundation construction method that reduces the disturbance to the soil structure around the subway tunnel. Contents of the invention [0005] In order to reduce ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D5/34E02D5/38E02D17/08E21B7/04E21B15/04
CPCE02D5/34E02D5/38E02D17/08E21B7/04E21B15/04Y02E10/72
Inventor 邹小卫徐强李家宏贺对喜雷志辉何万里李杰吕登超
Owner CRPCEC SHENZHEN ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products