Method for reusing upper-layer working face roadway for lower-layer working face
A technology for working face and roadway, applied in tunnels, mining equipment, earthwork drilling, etc., can solve problems such as waste of roadway resources, reduce the amount of roadway excavation works, ease the connection tension, and improve the coal recovery rate.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0023] The present invention will be described in detail below in conjunction with specific embodiments.
[0024] The present invention is aimed at the problem that roadway resource waste and coal pillar resource loss cannot be reused in the boundary area or special area outside the working face of stratified mining. The specific method of the present invention is to divide the boundary area or special area The two roadways on one side are arranged in different layers, the roadway close to the working face is arranged in the coal body of the upper layer working face, and the outer roadway is arranged in the coal body of the lower layer working face. During the mining process of the working face, the roadway close to the working face is scrapped behind the working face due to the collapse of the roof, and the outer roadway is reserved for the use of the lower stratified working face. , only need to excavate the roadway on the other side of the working face, reduce the amount of...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com