Construction method of diversion channels for ecological management of riverway
A technology for ecological management and construction methods, applied in chemical instruments and methods, artificial waterways, marine engineering, etc., can solve problems affecting urban ecological environment, river pollution, etc., achieve long service life, ensure adaptability, and improve carrying capacity. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0032] Embodiment one: comprise the steps:
[0033] Step 1: pumping water from the cofferdam, constructing a cofferdam dam body on the upper and lower reaches of the river channel 1 in the construction area, and then pumping water to the river section of the cofferdam to carry out the dry pond operation. Construction ready.
[0034] Step 2: Terrain shaping. After the cofferdam pumping is completed, perform terrain correction on the construction area, such as image 3 As shown, the ground is leveled in the central area of the river channel 1 and a backfill soil layer 7 is set, and aquatic plants 8 are planted in the backfill soil layer 7 to form an underwater forest and improve the ecological purification capacity of the river water; at the same time, the two sides of the river channel are selected to be close to the hard revetment The area of 6 is the construction area of the diversion canal, where the elevation and compactness of the soil are corrected in the construct...
Embodiment 2
[0043] Embodiment two: comprise the steps:
[0044] Step 1: pump water from the cofferdam, build a cofferdam dam body on the upper and lower reaches of the river in the construction area, then pump water from the river section of the cofferdam, and carry out dry pond operations. be prepared.
[0045] Step 2: Terrain shaping. After the cofferdam pumping is completed, perform terrain correction on the construction area, such as figure 2 As shown, the ground is leveled in the central area of the river channel 1 and a backfill soil layer 7 is set, and aquatic plants 8 are planted in the backfill soil layer 7 to form an underwater forest and improve the ecological purification capacity of the river water; The area of 6 is the construction area of the diversion canal, where the elevation and compactness of the soil are corrected in the construction area of the diversion canal to prepare for the construction of cement mixing piles.
[0046] Step 3: Construction of cement m...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com