Power system scheduling method and device considering uncertainty of wind power probability distribution
A power system scheduling and probability distribution technology, applied in circuit devices, wind power generation, information technology support systems, etc., can solve problems such as lack of wind power scheduling decision-making information, the efficiency of solving needs to be improved, and automatic optimization cannot be achieved, so as to increase large-scale systems. Application potential, improved conservatism, guaranteed effectiveness
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0039] This embodiment provides a power system scheduling method that takes into account the uncertainty of the probability distribution of wind power;
[0040] like figure 1 As shown, the power system scheduling method considering the uncertainty of the probability distribution of wind power includes:
[0041] S101: Construct an uncertain set of wind power probability distribution;
[0042] S102: Define the operation risk cost based on the uncertainty set of the probability distribution of wind power;
[0043] S103: Based on the operation and dispatch cost and operation risk cost of the power system, aiming at the lowest total operation cost of the power system, construct a robust economic dispatch model that takes into account the uncertainty of the probability distribution of wind power;
[0044] S104: Determine the optimization constraints of the robust economic dispatch model;
[0045] S105: Solve a robust economic dispatch model that takes into account the uncertainty o...
Embodiment 2
[0193] This embodiment provides a power system scheduling device that takes into account the uncertainty of the probability distribution of wind power;
[0194] Power system dispatching devices that take into account the uncertainty of the probability distribution of wind power, including:
[0195] An uncertain set building module, which is configured to: construct an uncertain set of wind power probability distribution;
[0196] a definition module, which is configured to: define the operation risk cost based on the uncertainty set of the probability distribution of wind power;
[0197] The objective function building module is configured to: based on the operation and dispatch cost and operation risk cost of the power system, with the goal of pursuing the lowest total operation cost of the power system, a robust economic dispatch model that takes into account the uncertainty of the probability distribution of wind power is constructed;
[0198] a constraint building block c...
Embodiment 3
[0204] This embodiment also provides an electronic device, comprising: one or more processors, one or more memories, and one or more computer programs; wherein the processor is connected to the memory, and the one or more computer programs are Stored in the memory, when the electronic device runs, the processor executes one or more computer programs stored in the memory, so that the electronic device executes the method described in the first embodiment.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com