Calculation method of bridge pile steel sleeve construction additional force
A steel casing and additional force technology, applied in excavation, sheet pile wall, foundation structure engineering, etc., can solve the problems of access, neglect of section construction, etc., to achieve a wide range of applications, fast and convenient calculation, and simple and clear calculation methods Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0065] The present invention will be further described below in conjunction with the embodiments and the accompanying drawings. The following examples are carried out on the premise of the technical solutions of the present invention, and the description of the examples is only used to help understand the present invention, rather than to limit the present invention. For those skilled in the art, several improvements and modifications can be made to the present invention without departing from the principle of the present invention. These improvements and modifications also fall within the protection scope of the claims of the present invention.
[0066] figure 1 It is a flow chart of a calculation method for the additional force of bridge pile steel casing construction shown according to an exemplary embodiment, refer to figure 1 , the method may include the following steps:
[0067] Step S11, establishing a calculation model for steel casing construction;
[0068] Step S...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com