Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Municipal road construction period traffic jam reason discrimination method

A technology for municipal roads and traffic congestion, applied in the field of traffic management, can solve problems affecting the normal life and travel of residents along the line, occupying a large area, and occupying roads for a long time, so as to improve efficiency and scientificity, and solve search difficulties.

Active Publication Date: 2021-06-11
中冶南方城市建设工程技术有限公司 +1
View PDF5 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In particular, large-scale construction projects occupy roads for a long time and occupy a large area, which brings great traffic pressure to surrounding roads and seriously affects the normal life and travel of residents along the line.
In addition, the traffic organization during the conventional construction period mainly relies on traffic police and construction guides to conduct manual command and guidance at key road sections and intersections. The more unable to effectively deal with complex traffic conditions
[0004] At present, there are few studies on alleviating traffic congestion during the construction period of municipal roads. Most of them are researches on the problem of traffic congestion on urban conventional roads, and the causes and measures of congestion are mostly analyzed from the macro level.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Municipal road construction period traffic jam reason discrimination method
  • Municipal road construction period traffic jam reason discrimination method
  • Municipal road construction period traffic jam reason discrimination method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0063] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.

[0064] Such as Figure 1-Figure 5 As shown, the municipal road construction period traffic jam cause discrimination method of the embodiment of the present invention, the method may further comprise the steps:

[0065] Step 1. Obtain historical traffic data, and conduct research on the traffic characteristics of the traffic system during the renovation and construction period of a city's main roads according to the four elements of the road traffic system: people, vehicles, roads, and environment;

[0066] Step 2. According to the research on traffic characteristics, classify the common causes of ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a municipal road construction period traffic jam reason discrimination method, which comprises the following steps of 1 acquiring historical traffic data, and researching traffic characteristics of a traffic system in a city main road reconstruction construction period according to four factors of a road traffic system; 2, classifying common congestion reasons of the traffic system in the municipal road construction period, and establishing a traffic system congestion reason tree model in the municipal road construction period; 3, traffic characterization characteristic analysis being carried out on various congestion reasons in the congestion reason tree model; and 4, collecting traffic data of the congested traffic road section through traffic information collection equipment arranged around the road, calculating the traffic index and judging the cause of the congested traffic road section. The method solves problems that the reason of traffic congestion during the construction period is difficult to find, efficiency is low, and management measures are not high in pertinence and poor in effect, can be used for guiding the decision-making of the traffic congestion treatment measures during the construction period in the future, and improves efficiency and scientificity of selecting the traffic treatment measures.

Description

technical field [0001] The invention relates to the technical field of traffic management, in particular to a method for judging the cause of traffic congestion during municipal road construction. Background technique [0002] my country has experienced the largest and fastest urbanization process in the history of the world. The urbanization rate of the permanent population has risen from 18% in 1978 to 60% in 2019. The achievements of urban development have attracted worldwide attention. However, in recent years, more and more cities in our country have suffered from many "urban diseases" including traffic congestion. Some intersections or sections of urban roads in the morning and evening peaks are caused by insufficient traffic capacity or traffic accidents. The decrease in speed and even the traffic congestion on a large-scale upstream section have affected the operating efficiency and development quality of the city. [0003] Not only the traffic congestion on normal ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G08G1/01G08G1/048G08G1/065
CPCG08G1/0125G08G1/0137G08G1/048G08G1/065
Inventor 邵俊豪杜光
Owner 中冶南方城市建设工程技术有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products