Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Auxiliary preparation system for regional power grid maintenance plan

A technology of maintenance planning and electrical connection, applied in system integration technology, information technology support system, computing and other directions, can solve the problem that the frequency, time and safety analysis of equipment power failure is not very accurate, the reliability and economy of power grid maintenance plan are not available. problems such as security, personnel experience and state dependence, and achieve far-reaching social benefits and indirect economic benefits, significant direct economic benefits, and ensure normal, stable, safe and reliable operation.

Active Publication Date: 2022-08-09
LUOHE POWER SUPPLY OF HENAN ELECTRIC POWER CORP
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] For power grid companies, planning and maintenance of power supply equipment is a complex and daily task, which is mostly completed by full-time personnel in the control center. There are few reliable and practical auxiliary software or tools, which usually require planning, operation and maintenance, dispatching, and power transformation. Multi-departmental and multi-professional personnel in the maintenance work area and ultra-high voltage work area cooperate closely with each other. At present, the maintenance plans of power supply equipment in most power grid companies are still compiled manually. This traditional method relies on approval, and different units, different The coordination between departments and different professions forms the maintenance plan on the basis of personal experience, which is highly dependent on personnel experience and status. The planning workload is heavy and the efficiency is low. The frequency, time and safety analysis of equipment power outages are not very accurate. In addition, the reliability and economy of the power grid maintenance plan cannot be guaranteed, resulting in unreasonable arrangements, such as repeated power outages, voltage overruns, etc., and the accumulation of data is incomplete, and it is difficult to conduct statistical analysis of data. Provide analysis basis for implementing condition-based maintenance and formulating a more reasonable maintenance plan

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Auxiliary preparation system for regional power grid maintenance plan
  • Auxiliary preparation system for regional power grid maintenance plan

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0019] The technical solution of the present patent will be described in further detail below in conjunction with specific embodiments.

[0020] Embodiments of the present patent are described in detail below, examples of which are illustrated in the accompanying drawings, wherein the same or similar reference numerals refer to the same or similar elements or elements having the same or similar functions throughout. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present patent, but should not be construed as a limitation on the present patent.

[0021] In the description of this patent, it should be understood that the terms "center", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", The orientation or positional relationship indicated by "top", "bottom", "inner", "outer", etc. is based on the orientation or positional relationship shown in the drawings, and is only for the ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an auxiliary preparation system for a regional power grid maintenance plan, which includes an advanced application layer unit, a business support layer unit, a basic management layer unit, and a data storage layer unit, and a data data output end and an input end of the advanced application layer unit and business support The data input terminal and the output terminal of the layer unit are electrically connected, the data output terminal of the service support layer unit is electrically connected to the data input terminal of the basic management layer, and the data output terminal of the basic management layer unit is electrically connected to the data input terminal of the data storage layer unit. , the auxiliary preparation system of the power grid maintenance plan in this area, the project results help the planners to timely and accurately understand the equipment operation and maintenance information and arrange the equipment maintenance plan correctly and without omission, reduce the workload of the planners, and reduce the human factors to the power grid management. Avoid repeated power outages to the greatest extent, reduce power outage losses, increase equipment service life, reduce unnecessary equipment maintenance costs, and have significant direct economic benefits.

Description

technical field [0001] The invention relates to the technical field of power grid maintenance, in particular to an auxiliary preparation system for a regional power grid maintenance plan. Background technique [0002] With the continuous development of my country's power technology and power demand and the increasing scale of modern power grids, the number of power supply equipment and power transmission and transformation facilities is also increasing. The normal service of each power supply equipment is the guarantee for the high-quality operation of the power grid. However, the time from the beginning of use to the final scrapping of the equipment is limited, and equipment abnormalities and failures are the main reasons that affect its safe operation. Within the normal service period of the equipment, reasonable arrangement of equipment maintenance in a certain way can effectively reduce accidental failures, prolong the service life of the equipment, and then ensure the s...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G06Q10/04G06Q10/06G06Q10/10G06Q10/00G06Q50/06
CPCG06Q10/04G06Q10/063118G06Q10/103G06Q10/20G06Q50/06Y04S10/50Y02E40/70
Inventor 韩源张亚平王绿茵郭薇胡丹周默陈士平陈瑜
Owner LUOHE POWER SUPPLY OF HENAN ELECTRIC POWER CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products