A "spider web"-shaped combined sand barrier with the functions of preventing sand collection and sand burial
A technology of sand barrier and sand burial, which is applied in soil protection, construction, and infrastructure engineering, etc., can solve the problems of no dredging and shunting, increased cost of grass squares, and huge total investment, so as to save paving materials and reduce Effect of sand collection and sand burial, area reduction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0021] In low (sand dune height less than 5 m) and compared to flat floral sand district (slope ≤ 30 °), with straw (grass, straw, sunflower rod, sorghum, corn stalk or branches), rolling "spider web" combination Sandwork, combined sandbladiness consists of arc sofaice and linear sofaper connection, and the arc mesh is composed of multi-layer arc network, and each layer of arc is composed of several elliptical sofehed. Rolling an elliptical sofa break according to the landform and the sand area. When the rolling is completed, the elliptical hip break is 2 m from the top of the top of the sand tackle. The linear spacing of the elliptic arc hip break is 1m, and the two neighboring three-line sofaff is included. ~ 4 elliptic arc hip breaks, between the two linear sofales including 2 to 3 elliptical arc hips, the distance between 1.5 ~ 2.5 m, transplanting shuttle or cituls, transplanting shuttle or lesser 70 strains, the height of the ocean grass was 20 cm.
[0022] When rolling the ...
Embodiment 2
[0024] The sand dunes sand slopes are ≤30 °, with wheat grass or straw as raw materials, rolling "spider web" combination sandblad. The "spider web" sandbath consists of an arc sofaver and a linear sofaper connection. The arc mesh is composed of a multi-layer arc network. Each layer of arc is constructed from several semicircular arc hip breaks, such as figure 1 . When the semi-arc sofaver is 1.5 m, when laying, the semi-arc hip breaks along the top of the sand tacks is 2 m, and the linear spacing of the semicircular hip break is 1M, the jack grass The height is 25 cm, the semicircular arc is on the direction of the main wind, and the distance between 1.5 ~ 2.5 m is 1.5 ~ 2.5 m. Each of the two-line sofa composed of 3 to 4 semi-circular soflability between the two linear sofales is composed of 3 ~ 4 semi-circular sofa breaks between 3 to 4 semi-circular soflamas. Semi-circular sofa composite.
[0025] When gravel, pebbles or soil is raw material, first use sand to heat a height 25...
Embodiment 3
[0027] The sand dune sand slut is satisfied with 30 ° figure 1 . When the arc sofaver is 1.2 m, when laying, the semi-circular arc hood is arranged in the top of the sand tackle to 1.5m, and the linear spacing of the semi-circular sofehed is 1m. The height is 25 cm, the arc top and the main sandstream direction are correct, and the distance between 1.5 ~ 2.5 m is 1.5 ~ 2.5 m. Performance of the two neighboring two linear sofales consists of 5 to 7 semi-circular arc soflamas, and there is 3 ~ 4 and a half of the arc network. Circular sofa composite.
[0028] When gravel, pebbles, graft or soil is raw material, first use sand to heat a height 25 cm semi-circular and linear bracket, which is then covering pebbles (or graft or soil) 15 cm, arc radius, laying method and the above same.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com