Internet of Things equipment working condition data analysis method and device and computer equipment
A technology of working condition data and analysis method, applied in the direction of calculation, electrical digital data processing, instrument, etc., can solve the problem of low accuracy of equipment working state positioning
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0049] figure 1 It is a flow chart of a method for analyzing working condition data of an IoT device provided in Embodiment 1 of the present invention, and the method includes the following steps:
[0050] Step S11: receiving original working condition data, and generating working condition data after performing resampling processing with a preset frequency on the original working condition data.
[0051] In the embodiment of the present invention, on the target device that needs to monitor the working status, a computer device that analyzes the working condition data of the IoT device can be connected through the Internet of Things. When the target device is running, the computer device can pass the Various sensors collect raw working condition data in real time, and resample the original working condition data to generate preset frequency working condition data, which is convenient for subsequent data analysis to obtain the working status of the current target equipment.
[0...
Embodiment 2
[0061] figure 2 It is a flow chart of a method for analyzing working condition data of an IoT device provided in Embodiment 2 of the present invention, and the method includes the following steps:
[0062] Step S21: receiving original working condition data, and generating working condition data after performing resampling processing with a preset frequency on the original working condition data.
[0063] This step is consistent with the above step S11, and will not be repeated here.
[0064] Step S22: using a preset algorithm to split the working condition data within a preset period of time into at least one working condition data segment with the same change trend.
[0065] This step is consistent with the above step S12, and will not be repeated here.
[0066] Step S23: Perform calculation and analysis on the at least one working condition data segment by using a preset physical model, where the preset physical model includes calculation rules when the target equipment ...
Embodiment 3
[0072] image 3 It is a flow chart of splitting working condition data segments provided by Embodiment 3 of the present invention, including the following steps:
[0073] Step S31: Read the working condition data within a preset time period, and set each data point as an initial data set.
[0074] Step S32: Using the preset algorithm to calculate the correlation parameter between two adjacent data sets.
[0075] In the embodiment of the present invention, the preset algorithm includes a linear regression algorithm, a covariance algorithm, a covariance matrix algorithm, a single regression algorithm or a multiple regression algorithm. An application program based on the above-mentioned preset algorithm can be set in the computer equipment. After reading the working condition data, two adjacent working condition data points can be input into the application program to obtain the difference between the working condition data points. Correlation parameters between.
[0076] Ste...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com