User order supplementing method, device and equipment and storage medium
A storage medium and user technology, applied in the Internet field, can solve the problems of not being able to meet the user's needs for purchasing goods, unable to meet the needs of purchasing goods, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
example 1
[0086] User A needs to purchase some goods, and places two orders in the morning and afternoon respectively to complete the purchase of goods;
[0087] User A places an order for the first time at 8:00 in the morning, with a total of 600 yuan, according to the minimum delivery rule of 400 yuan, and the full discount rule of 400 yuan minus 100 yuan, the actual payment is 500 yuan, an independent order can be generated, and it has not been placed before For the first order, the order delivery cycle set by the platform is from 0:00 to 17:00 every day, that is, if the order is placed within the above-mentioned time, the goods can be shipped on the same day, and the delivery is completed;
[0088] At this time, the generated order information includes the order number, delivery address, contact person, phone number, goods information and price of the goods;
[0089] At 4:00 p.m., user A feels that the quantity of goods in the order is not enough, and needs to add 200 yuan of goods,...
example 2
[0091] Example 2 is roughly the same as Example 1, the difference is:
[0092] User A places an order for the second time at 4:00 p.m., and the value of the order is: 500 yuan. According to the preferential rules, 100 yuan will be deducted, and the actual payment will be 400 yuan, which meets the separate delivery rules stipulated by the platform. Therefore, the second a separate first order.
example 3
[0094] Example 3 is roughly the same as Example 1, the difference is:
[0095] User A places an order for the second time at 6:00 p.m., and the value of the order is 200 yuan, which does not meet the full discount rules and delivery rules stipulated by the platform, and the order has already been placed after the end of the order cycle of the day, and cannot The first order of the day was added, so the order was rejected.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com