[0117] The preferred embodiment of the present invention provides an optimization method for hydropower cluster sending grids considering the horizon year, figure 1 On the basis of , establish the relevant mathematical model of electric power balance and analyze and solve it to obtain the outgoing channel scheme library of the hydropower cluster, and use the entropy weight method to further screen the alternative scheme library, and finally obtain the The strengthening scheme of the sending grid of hydropower clusters with check and channel constraints.
[0118] (1) Suppose the installed capacity of each power source of the hydropower group in a certain hydropower-rich area in a certain average water year and the expected output P under the joint operation after the connection of the leading reservoir G As shown in Table 1 - installed capacity and output parameters of the cascade power station.
[0119] Table 1 (unit: MW)
[0120]
[0121] The annual electricity consumpt...
Embodiment 2
[0138] In this example, on the basis of Example 1, it is further assumed that the load in the hydropower-rich area is increasing at a rate of 3% per year, and the full-year performance of the area in 2020, 2025, 2030, and 2035 is obtained by calculation on the basis of Table 2. Power consumption P D As shown in Table 6-Annual electricity consumption in a region from 2020 to 2035:
[0139] Table 6 (unit: MW)
[0140]
[0141] 1) The horizontal vision year is 2025: under the condition that the load increases and the installed capacity of each cascade power station remains unchanged in 2025, check whether the six power delivery schemes shown in Table 5 still meet the safety and stability constraints and the serious fault check Hard constraints such as channel constraints. The verification results show that Scheme 1, Scheme 2, Scheme 3, and Scheme 4 no longer meet the relevant inspection standards. Therefore, it is necessary to re-establish the channel outbound scheme for pow...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com