Separate foundation with functions of seismic reduction and isolation
A detachable, shock-absorbing technology, applied in the field of detached foundation, can solve the problems of no shock-absorbing function, permanent damage, building structure damage, etc., to protect life and property safety, reduce damage rate, and facilitate disassembly. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] In a typical implementation of the present application, such as Figure 1-Figure 5 As shown, a detached foundation with shock-absorbing and isolating functions is proposed.
[0034] The separated foundation is composed of three parts, the upper foundation is called the upper foundation 5, the lower part is called the lower foundation 10, and the side part is called the side support. The material of the upper foundation itself is reinforced concrete, which can be prefabricated or poured on site. The foundation adopts three-way (horizontal X, horizontal Y, vertical) shock-absorbing and isolation devices to reliably connect with the surrounding soil and the lower foundation;
[0035] Specifically, in the horizontal direction, multiple groups of buffer bearings are installed on the front, rear, and left and right sides of the upper foundation. The buffer bearings are fixed on the side supports through seismic isolation bearings and bolt plates. The spring and the shock-abs...
Embodiment 2
[0057] In another typical embodiment of the present application, a method for constructing a separated foundation as described in Embodiment 1 is also provided.
[0058] Include the following steps:
[0059] First, the lower foundation 10 adopts reinforced concrete material and the soil body 6 to be poured on site as a whole. When pouring the lower foundation, the first backing plate 9 is pre-embedded on the top surface of the lower foundation, and the second backing plate is placed on the first backing plate 9. 7. Install the shock-isolation support 8 on the second backing plate 7; place 4-8 groups of shock-isolation supports according to actual needs;
[0060] Then, on the support, the prefabricated upper foundation 5 (the upper foundation 5 can also be cast on site) is placed in place, and the soil around the foundation connects the side plate 1 (thickness 2-3cm) with the soil through the anchor bolt 3. body fixed.
[0061] Set detachable bolt plates 3 at the correspondin...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com