A Job Scheduling Method for Workshop Production Based on Clustering Niche Genetic Algorithm
A genetic algorithm and niche technology, applied in the field of workshop production scheduling based on clustering niche genetic algorithm
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0070] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0071] The present invention takes workshop production operation scheduling optimization as the carrier and KNGA algorithm as the main algorithm framework, and its flow chart is as follows figure 1 shown, including the following steps:
[0072] S1. The multi-objective function of production cost, processing time and equipment consumption cost is established, multiple constraints such as production process sequence, order quantity, and equipment effective time in the production process are proposed, and a mathematical model for optimizing workshop production scheduling is established.
[0073] The experimental verification of the present invention builds the optimization mathematical model of workshop production operation scheduling, and the objective function is production cost, and the formula is as follows:
[0074]
[0075] Amo...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com