BIM-based power transmission and transformation project whole-process dynamic cost management method

A management method and engineering cost technology, applied in the field of electric power system, can solve the problems of missing items in the bidding list, the settlement price exceeds the winning bid price, and it is difficult to achieve the effect of realizing efficiency, ensuring integrity and authenticity, and saving time.

Inactive Publication Date: 2020-05-22
NANJING ELECTRIC POWER ENG DESIGN +3
View PDF0 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, under the traditional management system and working methods, problems in the implementation of such cost control methods are constantly highlighted: it is difficult to effectively obtain the planned cost and progress information of each node to carry out real-time engineering cost based on the earned value principle. Control; for quota design, it is difficult to decompose its design indicators reasonably, which leads to the passive implementation of quota design, a plan intended to actively control the cost, etc.
Therefore, such methods cannot effectively control the project cost in actual projects. There are still missing items in the bidding list, inaccurate calculation of engineering quant

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0027] A BIM-based dynamic cost management method for the entire process of power transmission and transformation projects, characterized in that it includes the following steps: 1. Combining the characteristics of power transmission and transformation projects and the measurement standards of the bill of quantities, creating a standardized BIM model for power transmission and transformation projects family library to realize rapid and standardized modeling of power transmission and transformation projects; 2. Design engineering quantity calculation plug-ins for power transmission and transformation projects to realize rapid automatic calculation of power transmission and The cost management system platform for power transmission and transformation projects realizes information sharing among different project participants.

[0028] The specific method of the first step is: constructing a BIM-based power transmission and transformation engineering pricing model. The BIM model is...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a BIM-based power transmission and transformation project whole-process dynamic cost management method, which comprises the following steps: 1, creating a BIM standardized family library of a power transmission and transformation project in combination with the characteristics of the power transmission and transformation project and the measurement standard of a bill of quantities, and realizing rapid standardized modeling of the power transmission and transformation project; 2, designing a project amount calculation plug-in for the power transmission and transformationproject, and achieving the quick and automatic calculation of the construction cost of the power transmission and transformation project based on BIM; and 3, realizing information sharing among different project participants by developing a BIM-based power transmission and transformation project cost management system platform. According to the method, cost management of the whole life cycle of the power transmission and transformation project is realized; automatic measurement and calculation of the construction cost of each stage are realized, the integrity and authenticity of engineering data transmission are ensured, and the problems of disjunction and distortion of information transmission in the construction cost management process of the power transmission and transformation project are solved, so that the efficiency, accuracy, transparency and refinement level of construction cost management of the power transmission and transformation project are realized.

Description

technical field [0001] The invention relates to the field of power systems, and mainly relates to a BIM-based dynamic cost management method for the whole process of power transmission and transformation projects. Background technique [0002] Power transmission and transformation projects have the characteristics of complex construction conditions, large investment, long operation cycle, and large resource consumption. The cost management of the whole life cycle involves investment decision-making, design, bidding, construction, and completion acceptance. Multiple departments are responsible for the stage cost management, resulting in the independent existence of life cycle cost information of a project in each department system, lack of communication between departments, and poor data sharing, resulting in delicate life cycle cost management of power transmission and transformation projects level is not high. [0003] Cost management is the main task of cost management at...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/10G06Q50/08G06Q50/06G06T17/10
CPCG06Q10/103G06Q50/06G06Q50/08G06T17/10Y04S10/50
Inventor 南开辉方向张旺肖莹张华孙海森翟晓萌诸德律陈丹吴霜
Owner NANJING ELECTRIC POWER ENG DESIGN
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products