Bridge deck steel guardrail embedded part positioning structure

A technology of positioning structure and embedded parts, applied in the direction of bridge parts, bridges, bridge construction, etc., can solve the problems of complexity, prone to deviation, high labor intensity, etc., to achieve simple operation, good overall stability, and simple fixing. Effect

Pending Publication Date: 2020-04-14
GUIZHOU BRIDGE CONSTR GROUP +1
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

During the construction process of the PLTJ-12 section of the PLTJ-12 section of the Pingtang-Luodian section of the Yuqing-Anlong Expressway in Guizhou Province, the bridge deck steel guardrail embedded parts in the prior art are in the pouring process. The embedded parts of the steel guardrail are difficult to fix and are prone to offset, which leads to the inability to install the steel guardrail on the bridge deck in the subsequent installation of the embedded parts of the steel guardrail or the quality problem that the line of the guardrail is not straight due to insufficient installation accuracy of the embedded parts. Excavating the offset steel guardrail embedded parts and re-casting the steel guardrail embedded parts is labor-intensive and costly, and the steel structure on the original steel guardrail embedded parts will be destroyed during the excavation-re-pouring process. Reduce the overall stability of the bridge deck steel guardrail embedded parts, resulting in poor impact resistance on the bridge deck steel guardrail embedded parts; at the same time, it is strictly forbidden to use welding and fixing methods during the installation process of steel guardrail embedded parts to avoid the influence of high temperature and current The performance of the embedded parts of the steel guardrail, so the fixing of the embedded parts of the steel guardrail is difficult and complicated

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Bridge deck steel guardrail embedded part positioning structure
  • Bridge deck steel guardrail embedded part positioning structure
  • Bridge deck steel guardrail embedded part positioning structure

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0020] The present invention will be further described below in conjunction with the accompanying drawings and embodiments, but not as a basis for limiting the present invention.

[0021] Example. A bridge deck steel guardrail pre-embedded parts positioning structure, constituted as follows Figure 1-8 As shown, there are steel guardrail embedded parts on the left and right sides, and the steel guardrail embedded parts on the left and right sides are located on both sides of the horizontal pouring groove 9, and the middle of the horizontal pouring groove 9 is vertically provided with a longitudinal pouring groove 6, and the horizontal pouring groove 9 is provided with a horizontal reinforcement cage 8, and a longitudinal reinforcement cage 7 is provided in the longitudinal pouring groove 6; There are three screw rods 2, and a positioning block 3 is movable on the three screw rods 2 on the same side; the steel guardrail embedded part bottom plate 1 and the screw rod 2 below th...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a bridge deck steel guardrail embedded part positioning structure. The structure comprises steel guardrail embedded parts on the left side and the right side, the steel guardrail embedded parts on the left side and the right side are located on the two sides in a transverse pouring groove, a longitudinal pouring groove is vertically formed in the middle of the transverse pouring groove, a transverse reinforcement cage is arranged in the transverse pouring groove, and a longitudinal reinforcement cage is arranged in the longitudinal pouring groove; each steel guardrail embedded part comprises a steel guardrail embedded part bottom plate, three screws are arranged on each of the two sides of the upper end face of the steel guardrail embedded part bottom plate, and positioning blocks are movably arranged on the three screws on the same side. According to the invention, the steel guardrail embedded parts are simple to fix, the relative position of the steel guardrail embedded parts can be accurately controlled, construction similar to that of the guardrail embedded parts can be met, the quality problem that a bridge deck steel guardrail cannot be installed subsequently or the guardrail line type is not straight due to insufficient installation accuracy of the embedded parts is solved, and the bridge deck steel guardrail embedded part has the beneficial effects of being good in overall stability and easy to operate.

Description

technical field [0001] The invention relates to a lateral positioning structure, in particular to a positioning structure for embedded parts of steel guardrails on a bridge deck. Background technique [0002] In the steel structure bridge system, the bridge deck guardrail is the most intuitive structure on the bridge surface, and the line type and elevation of its embedded parts are the key to the construction quality control. During the construction process of the PLTJ-12 section of the PLTJ-12 section of the Pingtang-Luodian section of the Yuqing-Anlong Expressway in Guizhou Province, the bridge deck steel guardrail embedded parts in the prior art are in the pouring process. The embedded parts of the steel guardrail are difficult to fix and are prone to offset, which leads to the inability to install the steel guardrail on the bridge deck in the subsequent installation of the embedded parts of the steel guardrail or the quality problem that the line of the guardrail is not...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E01D19/10E01D21/00
CPCE01D19/103E01D21/00
Inventor 王斐度邱赛文蒋宇轩刘军龙黄永龙詹满尧崔吕赖凯田权曾明刚陈竹
Owner GUIZHOU BRIDGE CONSTR GROUP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products